Discover Opportunities months before the RFP drops
Learn more →Exterior: High pressure water clean (5,000 to 10,000 psi) and spot power tool clean to a SSPC-SP11 standard. Apply a three (3) coat epoxy urethane fluoropolymer system. Foundation: Water clean and apply a two (2) coat epoxy system. Repairs: 1)Install a gasket on the wet interior roof hatch. 2)Install handholds at the roof hatch. 3)Overflow discharge modification. 4)Replace the roof vent screen. 5)Reweld the sidewall stiffener in the wet interior.\r 6)Weld steel plates over the cathodic lift holes. Install bowl rigging couplings.\r 8)Replace the wet interior roof hatch - alternate. 9)Install a roof platform - alternate. 10)Install a wet interior ladder - alternate. 11)Install a riser grate - alternate.
Posted Date
Nov 19, 2025
Due Date
Dec 18, 2025
Release: Nov 19, 2025
Close: Dec 18, 2025
Exterior: High pressure water clean (5,000 to 10,000 psi) and spot power tool clean to a SSPC-SP11 standard. Apply a three (3) coat epoxy urethane fluoropolymer system. Foundation: Water clean and apply a two (2) coat epoxy system. Repairs: 1)Install a gasket on the wet interior roof hatch. 2)Install handholds at the roof hatch. 3)Overflow discharge modification. 4)Replace the roof vent screen. 5)Reweld the sidewall stiffener in the wet interior.\r 6)Weld steel plates over the cathodic lift holes. Install bowl rigging couplings.\r 8)Replace the wet interior roof hatch - alternate. 9)Install a roof platform - alternate. 10)Install a wet interior ladder - alternate. 11)Install a riser grate - alternate.
AvailableProject consists of renovation and addition work includes Category 2.2: Selective Demolition (Balance of Work) Work Category 3.2 : Concrete Work Category 4: Masonry Work Category 5.1 Cold Form Metal Framing and Exterior Wall Sheathing Work Category 6: General Trades Work Category 7.1: Metal Wall Panel Work Category 8: Glass and Glazing Work Category 9.1: Gypsum Board Assemblies and Acoustic Ceiling Work Category 9.2: Flooring and Tiling Work Category 9.3: Painting Work Category 9.4 : Wall Covering and Acoustical Walls Work Category 21 : Fire Suppression Work Category 22: Plumbing Systems Work Category 23: HVAC Systems Work Category 26.2: Electrical Systems Work Category 32 : Landscape and Irrigation.
Posted Date
Sep 19, 2025
Due Date
Oct 2, 2025
Release: Sep 19, 2025
Close: Oct 2, 2025
Project consists of renovation and addition work includes Category 2.2: Selective Demolition (Balance of Work) Work Category 3.2 : Concrete Work Category 4: Masonry Work Category 5.1 Cold Form Metal Framing and Exterior Wall Sheathing Work Category 6: General Trades Work Category 7.1: Metal Wall Panel Work Category 8: Glass and Glazing Work Category 9.1: Gypsum Board Assemblies and Acoustic Ceiling Work Category 9.2: Flooring and Tiling Work Category 9.3: Painting Work Category 9.4 : Wall Covering and Acoustical Walls Work Category 21 : Fire Suppression Work Category 22: Plumbing Systems Work Category 23: HVAC Systems Work Category 26.2: Electrical Systems Work Category 32 : Landscape and Irrigation.
Project consists of library renovation and addition. Work includes 02.1: selective demolition; 03.1: concrete (foundations, footings & interior flatwork); 05: structural steel; 07: roofing; 26.1: electrical systems (temporary utility + job hookups); 31: earthwork and site utilities.
Posted Date
Jul 20, 2025
Due Date
Aug 4, 2025
Release: Jul 20, 2025
Close: Aug 4, 2025
Project consists of library renovation and addition. Work includes 02.1: selective demolition; 03.1: concrete (foundations, footings & interior flatwork); 05: structural steel; 07: roofing; 26.1: electrical systems (temporary utility + job hookups); 31: earthwork and site utilities.
More RFPs available with Premium →
Premium
Access the largest public sector contact database
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Get complete source documentation & analysis