Discover Opportunities months before the RFP drops
Learn more →Redevelopment of 6. 5 acres in the downtown district to new multi-use development. The area, known as 161 south main street, consists of six separate parcels in one contiguous area.
Posted Date
Oct 31, 2025
Due Date
Feb 4, 2026
Release: Oct 31, 2025
Close: Feb 4, 2026
Redevelopment of 6. 5 acres in the downtown district to new multi-use development. The area, known as 161 south main street, consists of six separate parcels in one contiguous area.
AvailableRelease: Oct 30, 2025
Close: Dec 3, 2025
HHW collections services.
The project consists of the demolition of the existing wastewater pumping station and generator; installation of building footing; installation of building; installation of submersible pumps, davit, standby generator, station plumbing, and controls; repair and coating of existing wetwells; installation of new wetwell hatch with safety measures/fall protection; reconnection to the existing forcemain; and rehabilitation and replacement of a sewer manhole.
Posted Date
Sep 15, 2025
Due Date
Oct 15, 2025
Release: Sep 15, 2025
Close: Oct 15, 2025
The project consists of the demolition of the existing wastewater pumping station and generator; installation of building footing; installation of building; installation of submersible pumps, davit, standby generator, station plumbing, and controls; repair and coating of existing wetwells; installation of new wetwell hatch with safety measures/fall protection; reconnection to the existing forcemain; and rehabilitation and replacement of a sewer manhole.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis