Learn more →Ritchie to centerpoint installation.
Posted Date
Nov 16, 2025
Due Date
Dec 18, 2025
Release: Nov 16, 2025
Close: Dec 18, 2025
Ritchie to centerpoint installation.
AvailableRitchie to Centerpoint 34.5kV line steel pole procurement.
Posted Date
Oct 19, 2025
Due Date
Nov 6, 2025
Release: Oct 19, 2025
Close: Nov 6, 2025
Ritchie to Centerpoint 34.5kV line steel pole procurement.
Project consists of installation of approx. 1,400' of 36" storm sewer, 125' of 12" storm sewer, saw cutting, removal and replacement of the existing sidewalk, accessibility ramps, combination curb and gutter, pavement removal, aggregate base course, HMA pavement, riprap, necessary or required excavation, granular backfill or bedding.
Posted Date
Oct 1, 2025
Due Date
Oct 21, 2025
Release: Oct 1, 2025
Close: Oct 21, 2025
Project consists of installation of approx. 1,400' of 36" storm sewer, 125' of 12" storm sewer, saw cutting, removal and replacement of the existing sidewalk, accessibility ramps, combination curb and gutter, pavement removal, aggregate base course, HMA pavement, riprap, necessary or required excavation, granular backfill or bedding.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis