Discover Opportunities months before the RFP drops
Learn more →Work includes bridge removal and replacement, street realignment with new sidewalk installed along the southbound lane. See attached file and outside link.
Posted Date
Dec 1, 2025
Due Date
Jan 7, 2026
Release: Dec 1, 2025
Close: Jan 7, 2026
Work includes bridge removal and replacement, street realignment with new sidewalk installed along the southbound lane. See attached file and outside link.
AvailableSeeking proposals from consultants and firms interested in identifying and assessing Brownfield sites within the City. Contract term: 3 years.
Posted Date
Oct 3, 2025
Due Date
Nov 6, 2025
Release: Oct 3, 2025
Close: Nov 6, 2025
Seeking proposals from consultants and firms interested in identifying and assessing Brownfield sites within the City. Contract term: 3 years.
Project includes installing hyrda-stop insta-valves, proposed 8" and 16" ductile iron water mains and fittings, new pressure reducing valve and meter vault, abandoning existing check valve manhole and existing pressure reducing valve and meter vaults with flowable fill, and reestablishing turf in any areas disturbed during construction.
Posted Date
Mar 12, 2025
Due Date
Apr 2, 2025
Release: Mar 12, 2025
Close: Apr 2, 2025
Project includes installing hyrda-stop insta-valves, proposed 8" and 16" ductile iron water mains and fittings, new pressure reducing valve and meter vault, abandoning existing check valve manhole and existing pressure reducing valve and meter vaults with flowable fill, and reestablishing turf in any areas disturbed during construction.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis