Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project includes installing hyrda-stop insta-valves, proposed 8" and 16" ductile iron water mains and fittings, new pressure reducing valve and meter vault, abandoning existing check valve manhole and existing pressure reducing valve and meter vaults with flowable fill, and reestablishing turf in any areas disturbed during construction.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Construction of the Galveston Ave. Pressure Reducing Valve Replacement Project. The work includes installation of a new 6" pressure reducing valve (PRV) within a precast utility vault, along with all associated piping, fittings, and ancillary valves required for proper operation. The new vault will be connected to the existing water system through approx. 150 LF of 8" ductile iron water main with restrained joints. The scope also includes reconfiguration of existing piping and valves in the intersection of NW 17th Street and Galveston Avenue as necessary to integrate and ensure proper operation of the new PRV. Surface restoration will include a 2" grind and inlay of approx. 455 SY of asphalt pavement and any necessary curb replacement. Traffic control and erosion control are required as part of the work.
Posted Date
Dec 3, 2025
Due Date
Jan 8, 2026
Release: Dec 3, 2025
Premium
Access the largest public sector contact database
Close: Jan 8, 2026
Construction of the Galveston Ave. Pressure Reducing Valve Replacement Project. The work includes installation of a new 6" pressure reducing valve (PRV) within a precast utility vault, along with all associated piping, fittings, and ancillary valves required for proper operation. The new vault will be connected to the existing water system through approx. 150 LF of 8" ductile iron water main with restrained joints. The scope also includes reconfiguration of existing piping and valves in the intersection of NW 17th Street and Galveston Avenue as necessary to integrate and ensure proper operation of the new PRV. Surface restoration will include a 2" grind and inlay of approx. 455 SY of asphalt pavement and any necessary curb replacement. Traffic control and erosion control are required as part of the work.
AvailableThe City of Bend invites sealed bids for the Galveston Ave. Pressure Reducing Valve Replacement Project to install a new 6-inch pressure reducing valve (PRV) in a precast utility vault and connect it to the existing water system with ~150 linear feet of 8-inch ductile iron main. Work includes reconfiguration of existing piping and valves at NW 17th Street and Galveston Ave, plus surface restoration (2-inch grind and inlay ~455 sq yd) and necessary traffic/erosion control. The project is an ITB (construction) with performance to begin upon NTP (no later than 2026-03-02) and completion by 2026-06-19.
Posted Date
Dec 8, 2025
Due Date
Jan 8, 2026
Release: Dec 8, 2025
Close: Jan 8, 2026
The City of Bend invites sealed bids for the Galveston Ave. Pressure Reducing Valve Replacement Project to install a new 6-inch pressure reducing valve (PRV) in a precast utility vault and connect it to the existing water system with ~150 linear feet of 8-inch ductile iron main. Work includes reconfiguration of existing piping and valves at NW 17th Street and Galveston Ave, plus surface restoration (2-inch grind and inlay ~455 sq yd) and necessary traffic/erosion control. The project is an ITB (construction) with performance to begin upon NTP (no later than 2026-03-02) and completion by 2026-06-19.
AvailableConstruction of a Pressure-Reducing Valve Project generally consists of the procurement and installation of six (6) pressure-reducing valve stations, all at various locations.
Posted Date
Nov 16, 2025
Due Date
Dec 16, 2025
Release: Nov 16, 2025
Close: Dec 16, 2025
Construction of a Pressure-Reducing Valve Project generally consists of the procurement and installation of six (6) pressure-reducing valve stations, all at various locations.
AvailableConstruction of a Pressure-Reducing Valve Project generally consists of the procurement and installation of six (6) pressure-reducing valve stations, all at various locations.
Posted Date
Nov 16, 2025
Due Date
Dec 16, 2025
Release: Nov 16, 2025
Close: Dec 16, 2025
Construction of a Pressure-Reducing Valve Project generally consists of the procurement and installation of six (6) pressure-reducing valve stations, all at various locations.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis