Discover Opportunities months before the RFP drops
Learn more →Seeking professional engineering services for design of sidewalk.
Posted Date
Dec 3, 2025
Due Date
Jan 13, 2026
Release: Dec 3, 2025
Close: Jan 13, 2026
Seeking professional engineering services for design of sidewalk.
AvailableCity of Pensacola requests bids to remove and dispose of ~9,100 SF of existing 8" reinforced concrete slab and ~12" base and to construct ~9,100 SF of new 12" reinforced cast-in-place concrete floor slab on an 8" crushed stone base at Warehouse 5 (Port of Pensacola). Public works general-construction scope; requires a Florida licensed general contractor, 5% bid security, 5% M/WBE participation goal, 10 days to mobilize, 60 calendar days for completion after NTP, and $500/day liquidated damages for delay.
Posted Date
Oct 1, 2025
Due Date
Dec 30, 2025
Release: Oct 1, 2025
Close: Dec 30, 2025
City of Pensacola requests bids to remove and dispose of ~9,100 SF of existing 8" reinforced concrete slab and ~12" base and to construct ~9,100 SF of new 12" reinforced cast-in-place concrete floor slab on an 8" crushed stone base at Warehouse 5 (Port of Pensacola). Public works general-construction scope; requires a Florida licensed general contractor, 5% bid security, 5% M/WBE participation goal, 10 days to mobilize, 60 calendar days for completion after NTP, and $500/day liquidated damages for delay.
AvailableThe areas to be serviced under this contract shall include the turf, pavement, curbing and sidewalks within the service areas described in the specifications. Seasonal ground maintenance of Airport owned outparcels and right-ofways. The Season is defined as the period from April 1 through November 30. Term of the agreement shall be five (5) years.
Posted Date
Dec 2, 2025
Due Date
Jan 7, 2026
Release: Dec 2, 2025
Close: Jan 7, 2026
The areas to be serviced under this contract shall include the turf, pavement, curbing and sidewalks within the service areas described in the specifications. Seasonal ground maintenance of Airport owned outparcels and right-ofways. The Season is defined as the period from April 1 through November 30. Term of the agreement shall be five (5) years.
AvailableMore RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis