Learn more →Work includes 1 LS install modular roundabout kit; 10 EA flexible guide post; 1 LS permanent signing; 4 EA removing painted traffic marking; 700 LF removing paint line; 6 EA plastic yield line symbol; 2,200 LF paint line.
Posted Date
Dec 8, 2025
Due Date
Dec 19, 2025
Release: Dec 8, 2025
Close: Dec 19, 2025
Work includes 1 LS install modular roundabout kit; 10 EA flexible guide post; 1 LS permanent signing; 4 EA removing painted traffic marking; 700 LF removing paint line; 6 EA plastic yield line symbol; 2,200 LF paint line.
AvailableWork includes 1 LS install modular roundabout kit; 10 EA flexible guide post; 1 LS permanent signing; 4 EA removing painted traffic marking; 700 LF removing paint line; 6 EA plastic yield line symbol; 2,200 LF paint line.
Posted Date
Dec 8, 2025
Due Date
Dec 11, 2025
Release: Dec 8, 2025
Close: Dec 11, 2025
Work includes 1 LS install modular roundabout kit; 10 EA flexible guide post; 1 LS permanent signing; 4 EA removing painted traffic marking; 700 LF removing paint line; 6 EA plastic yield line symbol; 2,200 LF paint line.
Replace concrete channel and stop gates for the Sand Dunes Wastewater Facility. Remove reinforced concrete channel and install approx. 14 CY of reinforced concrete with 1,812 pounds of steel reinforcement. Install nine new fiberglass composite stop gates with aluminum frames and stop gate covers in the reconstructed concrete channel and install 250 SF of mesh fibergrate with associated aluminum frames. Install 53 LF of 20" C900 PVC sewer force main with two 20" gate valves and two 20" tees. Work includes 36 SY of HMA patching and bypass pumping.
Posted Date
Oct 22, 2025
Due Date
Nov 18, 2025
Release: Oct 22, 2025
Close: Nov 18, 2025
Replace concrete channel and stop gates for the Sand Dunes Wastewater Facility. Remove reinforced concrete channel and install approx. 14 CY of reinforced concrete with 1,812 pounds of steel reinforcement. Install nine new fiberglass composite stop gates with aluminum frames and stop gate covers in the reconstructed concrete channel and install 250 SF of mesh fibergrate with associated aluminum frames. Install 53 LF of 20" C900 PVC sewer force main with two 20" gate valves and two 20" tees. Work includes 36 SY of HMA patching and bypass pumping.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis