Discover Opportunities months before the RFP drops
Learn more →The City of Marysville is soliciting sealed bids to widen 156th Street NE from Smokey Point Boulevard to Hayho Creek, including sidewalk and roadway widening, drainage, a vegetated‑face geosynthetic wall, intersection upgrades, a new pedestrian signal, illumination, and landscaping. Bids are due at the City Clerk’s Office by 10:00 a.m. local time on December 15, 2025; plans and specifications are available via the Builders Exchange of Washington.
Posted Date
Nov 20, 2025
Due Date
Dec 15, 2025
Release: Nov 20, 2025
Close: Dec 15, 2025
The City of Marysville is soliciting sealed bids to widen 156th Street NE from Smokey Point Boulevard to Hayho Creek, including sidewalk and roadway widening, drainage, a vegetated‑face geosynthetic wall, intersection upgrades, a new pedestrian signal, illumination, and landscaping. Bids are due at the City Clerk’s Office by 10:00 a.m. local time on December 15, 2025; plans and specifications are available via the Builders Exchange of Washington.
AvailableThe Work to be performed shall include: Construction of sidewalk and roadway widening from Smokey Point Boulevard to Hayho Creek, Grading, installation of vegetated faced geosynthetic wall, and installation of storm drainage facilities, Intersection improvements at 39th Avenue NE (curb ramps, curb and gutter, pavement restoration, hardscape/landscape features, and pavement marking), New pedestrian traffic signal at 156th Street NE and Smokey Point Boulevard, New illumination system along the corridor, Installation of landscape and irrigation improvements, and other work necessary to complete the Project.
Posted Date
Nov 20, 2025
Due Date
Dec 18, 2025
Release: Nov 20, 2025
Close: Dec 18, 2025
The Work to be performed shall include: Construction of sidewalk and roadway widening from Smokey Point Boulevard to Hayho Creek, Grading, installation of vegetated faced geosynthetic wall, and installation of storm drainage facilities, Intersection improvements at 39th Avenue NE (curb ramps, curb and gutter, pavement restoration, hardscape/landscape features, and pavement marking), New pedestrian traffic signal at 156th Street NE and Smokey Point Boulevard, New illumination system along the corridor, Installation of landscape and irrigation improvements, and other work necessary to complete the Project.
AvailableInstall new impressed current cathodic protection systems at the reservoirs. Work at each reservoir consists of supplying and installing a rectifier, reference electrodes, anodes, electrical conduit, and connecting to existing power available at each reservoir.
Posted Date
Jul 30, 2025
Due Date
Aug 13, 2025
Release: Jul 30, 2025
Close: Aug 13, 2025
Install new impressed current cathodic protection systems at the reservoirs. Work at each reservoir consists of supplying and installing a rectifier, reference electrodes, anodes, electrical conduit, and connecting to existing power available at each reservoir.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis