Discover Opportunities months before the RFP drops
Learn more →Release: Dec 17, 2025
Close: Jan 7, 2026
Audio/video upgrade project.
AvailableWorks include approx 16,837 LF of 8" Sewer pipe cleaning; 16,837 LF of 8" Sewer pipe cleaning; 2,000 LF of heavy cleaning, 2,000 LF of root cutting; 6,660 LF of 10" sewer pipe cleaning.
Posted Date
Sep 4, 2025
Due Date
Sep 17, 2025
Release: Sep 4, 2025
Close: Sep 17, 2025
Works include approx 16,837 LF of 8" Sewer pipe cleaning; 16,837 LF of 8" Sewer pipe cleaning; 2,000 LF of heavy cleaning, 2,000 LF of root cutting; 6,660 LF of 10" sewer pipe cleaning.
The project includes sidewalk removal to allow for new tree-pits within the existing sidewalk, curb replacements and new ladder crosswalks as well as planting new trees and shrubs. Work will require the disposal of concrete and other miscellaneous material. The contractor will also be responsible for preparing the planting areas with topsoil and compost and finishing with mulch matching other landscaping in the downtown.
Posted Date
Aug 21, 2025
Due Date
Sep 3, 2025
Release: Aug 21, 2025
Close: Sep 3, 2025
The project includes sidewalk removal to allow for new tree-pits within the existing sidewalk, curb replacements and new ladder crosswalks as well as planting new trees and shrubs. Work will require the disposal of concrete and other miscellaneous material. The contractor will also be responsible for preparing the planting areas with topsoil and compost and finishing with mulch matching other landscaping in the downtown.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis