Discover Opportunities months before the RFP drops
Learn more →The City of Manchester requests sealed bids to remove and replace the baby pool slide feature at Schroeder Park Aquatic Center (with add alternates for rocking frogs, spraying seahorse, and spraying rainbow features). Preference for slide work not to exceed $165,000 and completion by May 1, 2026. Bidders must have ≥5 years municipal pool/waterpark experience, provide performance/payment bonds and specified insurance limits, comply with prevailing wage and federal work-authorization requirements, and the City will award a single exclusive contractor (no subcontractors).
Posted Date
Dec 5, 2025
Due Date
Jan 22, 2026
Release: Dec 5, 2025
Close: Jan 22, 2026
The City of Manchester requests sealed bids to remove and replace the baby pool slide feature at Schroeder Park Aquatic Center (with add alternates for rocking frogs, spraying seahorse, and spraying rainbow features). Preference for slide work not to exceed $165,000 and completion by May 1, 2026. Bidders must have ≥5 years municipal pool/waterpark experience, provide performance/payment bonds and specified insurance limits, comply with prevailing wage and federal work-authorization requirements, and the City will award a single exclusive contractor (no subcontractors).
AvailableWork consists of the removal and replacement of existing pedestrian facilities and installation of new pedestrian facilities. A new pedestrian facility will be added to the north side of road including a prefabricated steel truss pedestrian bridge over grand glaize creek. The existing pedestrian facility along the south side of road will be reconstructed. Curb ramps and commercial entrances throughout the corridor will be replaced (as required) to bring them into ada compliance. Pedestrian traffic signal modifications, modular block retaining walls, striping, traffic control, and other items shall be included as shown in the plans.
Posted Date
Aug 9, 2025
Due Date
Sep 4, 2025
Release: Aug 9, 2025
Close: Sep 4, 2025
Work consists of the removal and replacement of existing pedestrian facilities and installation of new pedestrian facilities. A new pedestrian facility will be added to the north side of road including a prefabricated steel truss pedestrian bridge over grand glaize creek. The existing pedestrian facility along the south side of road will be reconstructed. Curb ramps and commercial entrances throughout the corridor will be replaced (as required) to bring them into ada compliance. Pedestrian traffic signal modifications, modular block retaining walls, striping, traffic control, and other items shall be included as shown in the plans.
The scope of work consists of the removal and replacement of existing pedestrian facilities and installation of new pedestrian facilities. Pedestrian traffic signal modifications, modular block retaining walls, striping, traffic control, and other items. See attached file.
Posted Date
Aug 7, 2025
Due Date
Sep 4, 2025
Release: Aug 7, 2025
Close: Sep 4, 2025
The scope of work consists of the removal and replacement of existing pedestrian facilities and installation of new pedestrian facilities. Pedestrian traffic signal modifications, modular block retaining walls, striping, traffic control, and other items. See attached file.
More RFPs available with Premium →
Premium
Access the largest public sector contact database
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Get complete source documentation & analysis