Learn more →Improvements will include the new sidewalk, minor stormwater improvements, a section of curb and gutter, handrails, and associated grading in order for the proposed sidewalk to meet ADA standards.
Posted Date
Dec 9, 2025
Due Date
Jan 7, 2026
Release: Dec 9, 2025
Close: Jan 7, 2026
Improvements will include the new sidewalk, minor stormwater improvements, a section of curb and gutter, handrails, and associated grading in order for the proposed sidewalk to meet ADA standards.
AvailableProvide Storm drainage replacement within the housing authority and additional storm drainage being installed. This includes cut and patch, demolition, sidewalk pouring, stabilization, curb and gutter work, and storm drain pipe installation. 1 LS mobilization; 1 LS demolition; 1 LS temporary measures; 1 LS construction staking; 1 LS temporary road access; 1 LS erosion control; 670 CY export/import suitable soil; 1 LS traffic control; 200 LF grading swale; 100 SY cut and patch asphalt; 30 SY replace sidewalk; 65 LF replace curb and gutter; 375 LF 18" rcp storm drain pipe; 90 lf 24" rcp storm drain pipe; 320 lf 36" rcp storm drain pipe; 370 LF 48" rcp storm drain pipe; 10 EA catch basin (type 9); 2 EA catch basin (type 1); 1 EA catch basin (type 18); 1 EA junction box; 1 LS landscaping repair/replacement. See attached file.
Posted Date
Aug 15, 2025
Due Date
Oct 7, 2025
Release: Aug 15, 2025
Close: Oct 7, 2025
Provide Storm drainage replacement within the housing authority and additional storm drainage being installed. This includes cut and patch, demolition, sidewalk pouring, stabilization, curb and gutter work, and storm drain pipe installation. 1 LS mobilization; 1 LS demolition; 1 LS temporary measures; 1 LS construction staking; 1 LS temporary road access; 1 LS erosion control; 670 CY export/import suitable soil; 1 LS traffic control; 200 LF grading swale; 100 SY cut and patch asphalt; 30 SY replace sidewalk; 65 LF replace curb and gutter; 375 LF 18" rcp storm drain pipe; 90 lf 24" rcp storm drain pipe; 320 lf 36" rcp storm drain pipe; 370 LF 48" rcp storm drain pipe; 10 EA catch basin (type 9); 2 EA catch basin (type 1); 1 EA catch basin (type 18); 1 EA junction box; 1 LS landscaping repair/replacement. See attached file.
Storm drainage improvements. This includes upsizing of pipes, cut and patch, demolition, and stabilization.
Posted Date
Jan 9, 2025
Due Date
Feb 11, 2025
Release: Jan 9, 2025
Close: Feb 11, 2025
Storm drainage improvements. This includes upsizing of pipes, cut and patch, demolition, and stabilization.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis