Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide Storm drainage replacement within the housing authority and additional storm drainage being installed. This includes cut and patch, demolition, sidewalk pouring, stabilization, curb and gutter work, and storm drain pipe installation. 1 LS mobilization; 1 LS demolition; 1 LS temporary measures; 1 LS construction staking; 1 LS temporary road access; 1 LS erosion control; 670 CY export/import suitable soil; 1 LS traffic control; 200 LF grading swale; 100 SY cut and patch asphalt; 30 SY replace sidewalk; 65 LF replace curb and gutter; 375 LF 18" rcp storm drain pipe; 90 lf 24" rcp storm drain pipe; 320 lf 36" rcp storm drain pipe; 370 LF 48" rcp storm drain pipe; 10 EA catch basin (type 9); 2 EA catch basin (type 1); 1 EA catch basin (type 18); 1 EA junction box; 1 LS landscaping repair/replacement. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The Town of Tyrone, Georgia is soliciting sealed bids for construction services to complete storm drainage improvements at various locations within the town. The work is expected to include installation or rehabilitation of storm drain pipes and structures with associated site work and restoration.
Posted Date
-
Due Date
Dec 18, 2025
Release: -
Close: Dec 18, 2025
The Town of Tyrone, Georgia is soliciting sealed bids for construction services to complete storm drainage improvements at various locations within the town. The work is expected to include installation or rehabilitation of storm drain pipes and structures with associated site work and restoration.
AvailableThe Town of Tyrone, Georgia is soliciting sealed bids for construction services to complete storm drainage improvements at various locations within the town. The work is expected to include installation or rehabilitation of storm drain pipes and structures with associated site work and restoration.
Posted Date
-
Due Date
Dec 18, 2025
Release: -
Close: Dec 18, 2025
The Town of Tyrone, Georgia is soliciting sealed bids for construction services to complete storm drainage improvements at various locations within the town. The work is expected to include installation or rehabilitation of storm drain pipes and structures with associated site work and restoration.
AvailableWork includes approx. 1,140 LF of silt fence (SD1-type 'NS'); 622 LF of 30" RCP storm pipe; 548 LF of 36" RCP storm pipe; 550 SY of number 57 stone pipe bedding, 8" thickness; 409 LF of 4" perforated pipe with sock; 1,705 CY of grading, demucking, topsoiling, and reapplying of existing soils; see attached file and outside links for more details.
Posted Date
Nov 14, 2025
Due Date
Dec 18, 2025
Release: Nov 14, 2025
Close: Dec 18, 2025
Work includes approx. 1,140 LF of silt fence (SD1-type 'NS'); 622 LF of 30" RCP storm pipe; 548 LF of 36" RCP storm pipe; 550 SY of number 57 stone pipe bedding, 8" thickness; 409 LF of 4" perforated pipe with sock; 1,705 CY of grading, demucking, topsoiling, and reapplying of existing soils; see attached file and outside links for more details.
Available(2,652-Ft) Drainage improvements, installation of new trunk storm sewer includes pavement restoration, designed overlay, curb ramps for sidewalks (ADA) improvements and lane re-allocation via pavement markings. See outside link.
Posted Date
Dec 9, 2025
Due Date
Jan 16, 2026
Release: Dec 9, 2025
Close: Jan 16, 2026
(2,652-Ft) Drainage improvements, installation of new trunk storm sewer includes pavement restoration, designed overlay, curb ramps for sidewalks (ADA) improvements and lane re-allocation via pavement markings. See outside link.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis