Discover Opportunities months before the RFP drops
Learn more →Project consists of 104,590 SF cold-mill existing AC pavement (1.5" min.), 190 LF remove, salvage, and relocate existing chain link fence, 617 LF sawcut and remove existing PCC curb and/or gutter, 7,853 SF sawcut and remove existing PCC driveway access, sidewalk, ramp, driveway, spandrel, and/or cross gutter, 38,001 SF remove existing AC pavement, aggregate base, 1,430 TN construct 1.5" asphalt concrete pavement overlay, 12,202 SF construct 4" PCC sidewalk, 150 LF install new chain link fence, see outside link.
Posted Date
Dec 4, 2025
Due Date
Jan 14, 2026
Release: Dec 4, 2025
Close: Jan 14, 2026
Project consists of 104,590 SF cold-mill existing AC pavement (1.5" min.), 190 LF remove, salvage, and relocate existing chain link fence, 617 LF sawcut and remove existing PCC curb and/or gutter, 7,853 SF sawcut and remove existing PCC driveway access, sidewalk, ramp, driveway, spandrel, and/or cross gutter, 38,001 SF remove existing AC pavement, aggregate base, 1,430 TN construct 1.5" asphalt concrete pavement overlay, 12,202 SF construct 4" PCC sidewalk, 150 LF install new chain link fence, see outside link.
AvailableProvide professional engineering services in multiple professional categories and corresponding specialty areas on an on-call basis as follows: construction management, construction inspection, geotechnical engineering, inspection, and material testing, land surveying, project management. See outside link.
Posted Date
Nov 24, 2025
Due Date
Dec 22, 2025
Release: Nov 24, 2025
Close: Dec 22, 2025
Provide professional engineering services in multiple professional categories and corresponding specialty areas on an on-call basis as follows: construction management, construction inspection, geotechnical engineering, inspection, and material testing, land surveying, project management. See outside link.
AvailableProject includes various safety and sidewalk improvements within existing City right-of-way (where possible). Improvements will also include drive approaches, accessible curb ramps conforming to current ADA standards, street signing and striping, actuated pedestrian solar flashing beacons for multiple crosswalk locations, and construction of DG trails and trail fencing.
Posted Date
Nov 13, 2025
Due Date
Dec 10, 2025
Release: Nov 13, 2025
Close: Dec 10, 2025
Project includes various safety and sidewalk improvements within existing City right-of-way (where possible). Improvements will also include drive approaches, accessible curb ramps conforming to current ADA standards, street signing and striping, actuated pedestrian solar flashing beacons for multiple crosswalk locations, and construction of DG trails and trail fencing.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis