Discover Opportunities months before the RFP drops
Learn more →Asphalt concrete and Portland Cement removal, construction, and repair. Concrete sidewalk removal and reconstruction, trenching, storm drain and catch basin construction, traffic control, and signing and striping.
Posted Date
Dec 25, 2025
Due Date
Jan 15, 2026
Release: Dec 25, 2025
Close: Jan 15, 2026
Asphalt concrete and Portland Cement removal, construction, and repair. Concrete sidewalk removal and reconstruction, trenching, storm drain and catch basin construction, traffic control, and signing and striping.
AvailableRemoval and replacement of, in kind, the two (2) existing Lockinvar Boilers. Work shall include all necessary piping and appurtenances to provide a functional system. The project shall also include providing a temporary boiler to provide continuous service during the replacement. In addition to the boiler work, the project will involved the construction of new support pad for boilers, existing drywall removal, replacement and painting.
Posted Date
Aug 28, 2025
Due Date
Oct 2, 2025
Release: Aug 28, 2025
Close: Oct 2, 2025
Removal and replacement of, in kind, the two (2) existing Lockinvar Boilers. Work shall include all necessary piping and appurtenances to provide a functional system. The project shall also include providing a temporary boiler to provide continuous service during the replacement. In addition to the boiler work, the project will involved the construction of new support pad for boilers, existing drywall removal, replacement and painting.
Removal and replacement of asphalt shingle roof systems and related flashings at steep-sloped roof sections with new asphalt shingles and flashing, the removal and replacement of built-up roof systems covering low-sloped roof sections with new 60-mil fully adhered pvc single ply membrane systems and related flashings, and the completion of repairs and maintenance measures to existing roof systems, flashings, and accessories.
Posted Date
Jun 19, 2025
Due Date
Jul 24, 2025
Release: Jun 19, 2025
Close: Jul 24, 2025
Removal and replacement of asphalt shingle roof systems and related flashings at steep-sloped roof sections with new asphalt shingles and flashing, the removal and replacement of built-up roof systems covering low-sloped roof sections with new 60-mil fully adhered pvc single ply membrane systems and related flashings, and the completion of repairs and maintenance measures to existing roof systems, flashings, and accessories.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis