Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Removal and replacement of asphalt shingle roof systems and related flashings at steep-sloped roof sections with new asphalt shingles and flashing, the removal and replacement of built-up roof systems covering low-sloped roof sections with new 60-mil fully adhered pvc single ply membrane systems and related flashings, and the completion of repairs and maintenance measures to existing roof systems, flashings, and accessories.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Removal and replacement of existing modified bitumen roof systems for approximately 6 squares. Roof replacement includes roof deck repairs, insulation system, and a modified bitumen roof system. Roof repairs include repairs on standing seam metal roof areas. Associated sheet metal components and accessories are included.
Posted Date
Nov 18, 2025
Due Date
Jan 8, 2026
Release: Nov 18, 2025
Close: Jan 8, 2026
Removal and replacement of existing modified bitumen roof systems for approximately 6 squares. Roof replacement includes roof deck repairs, insulation system, and a modified bitumen roof system. Roof repairs include repairs on standing seam metal roof areas. Associated sheet metal components and accessories are included.
Premium
Access the largest public sector contact database
Removal and replacement of existing modified bitumen roof systems for approximately 179 squares. Roof replacement includes roof deck repairs, base sheet system, insulation system, and a modified bitumen roof system. Roof repairs includes repairs on existing standing seam metal roof areas.
Posted Date
Nov 18, 2025
Due Date
Jan 8, 2026
Release: Nov 18, 2025
Close: Jan 8, 2026
Removal and replacement of existing modified bitumen roof systems for approximately 179 squares. Roof replacement includes roof deck repairs, base sheet system, insulation system, and a modified bitumen roof system. Roof repairs includes repairs on existing standing seam metal roof areas.
AvailableRelease: Dec 10, 2025
Close: Jan 9, 2026
Roof replacements.
AvailableCompetitive sealed proposals for roof replacements/repairs and HVAC upgrades at North Shore Middle School and Cunningham Middle School. Scope includes roof restorations (flute fill ISO, coverboard, 60‑mil felt‑back PVC with decor ribs, gutters/downspouts, modified bitumen cap) with 20‑year NDL warranty and HVAC upgrades at Cunningham (controls upgrade, replace 4 AHUs, replace DX coil & condenser, install 13 VFDs, replace 6 hydronic cooling pumps). A 10% proposal security (bid bond) is required.
Posted Date
Dec 7, 2025
Due Date
Jan 12, 2026
Release: Dec 7, 2025
Close: Jan 12, 2026
Competitive sealed proposals for roof replacements/repairs and HVAC upgrades at North Shore Middle School and Cunningham Middle School. Scope includes roof restorations (flute fill ISO, coverboard, 60‑mil felt‑back PVC with decor ribs, gutters/downspouts, modified bitumen cap) with 20‑year NDL warranty and HVAC upgrades at Cunningham (controls upgrade, replace 4 AHUs, replace DX coil & condenser, install 13 VFDs, replace 6 hydronic cooling pumps). A 10% proposal security (bid bond) is required.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis