Discover Opportunities months before the RFP drops
Learn more →Construction services for replacement of the Adair Avenue water main: installation of ~1,847 LF of 6" C-900 PVC main, 105 LF 6" HDPE directional bore, service lines, encasement/bored crossings, reconnections and tie‑ins, gate valves, hydrants, tapping sleeves, pavement/driveway/sidewalk/curb replacements, excavation, seeding, tree removal, and related work per contract documents.
Posted Date
Dec 5, 2025
Due Date
Jan 13, 2026
Release: Dec 5, 2025
Close: Jan 13, 2026
Construction services for replacement of the Adair Avenue water main: installation of ~1,847 LF of 6" C-900 PVC main, 105 LF 6" HDPE directional bore, service lines, encasement/bored crossings, reconnections and tie‑ins, gate valves, hydrants, tapping sleeves, pavement/driveway/sidewalk/curb replacements, excavation, seeding, tree removal, and related work per contract documents.
AvailableThe approximate quantities for the principal items of work under this contract are: 1847 LF - 6" c-900, PVC water main; 105 LF - 6" hdpe pipe (dr11) (directional bore); 520 LF - 3/4" service line; 380 LF - 2" PVC encasement (bored); 16 each - water service reconnection (complete in place); 2 each - tie-in to existing water system; 4 each - 6" gate valve with box; 4 each - fire hydrant assembly (complete); 100 lf - saw cut pavement/driveways (variable depth); 125 SY - remove and replace asphalt pavement (crush stone); 100 SY - remove and replace concrete drive; 50 Y - remove and replace concrete sidewalk; 100 SY - remove and replace concrete curb & gutter; 100 SY - borrow excavation (class 9) (fm); 0.25 acres - seeding and mulching; 1 each - 6" tapping sleeve and valve with box; 7 each - tree removal, all sizes.
Posted Date
Aug 1, 2025
Due Date
Jan 13, 2026
Release: Aug 1, 2025
Close: Jan 13, 2026
The approximate quantities for the principal items of work under this contract are: 1847 LF - 6" c-900, PVC water main; 105 LF - 6" hdpe pipe (dr11) (directional bore); 520 LF - 3/4" service line; 380 LF - 2" PVC encasement (bored); 16 each - water service reconnection (complete in place); 2 each - tie-in to existing water system; 4 each - 6" gate valve with box; 4 each - fire hydrant assembly (complete); 100 lf - saw cut pavement/driveways (variable depth); 125 SY - remove and replace asphalt pavement (crush stone); 100 SY - remove and replace concrete drive; 50 Y - remove and replace concrete sidewalk; 100 SY - remove and replace concrete curb & gutter; 100 SY - borrow excavation (class 9) (fm); 0.25 acres - seeding and mulching; 1 each - 6" tapping sleeve and valve with box; 7 each - tree removal, all sizes.
AvailableWork includes entrance road rehabilitation.
Posted Date
Jul 4, 2025
Due Date
Aug 4, 2025
Release: Jul 4, 2025
Close: Aug 4, 2025
Work includes entrance road rehabilitation.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis