Discover Opportunities months before the RFP drops
Learn more →Work includes approx. Lighting units, receptacle stanchions, service cabinet, equipment pad, non-metallic conduit, underground wire, and site restoration. See outside link for more details.
Posted Date
Nov 21, 2025
Due Date
Dec 12, 2025
Release: Nov 21, 2025
Close: Dec 12, 2025
Work includes approx. Lighting units, receptacle stanchions, service cabinet, equipment pad, non-metallic conduit, underground wire, and site restoration. See outside link for more details.
3 EA clearing & grubbing; 1 EA remove bollard; 270 LF remove curb & gutter; 440 LF sawing bit or concrete pavement; 1600 SY remove bituminous pavement; 90 SY remove driveway or walk; 990 CY excavation-common (EV) (P); 980 SY geotextile fabric type 4 (P); 980 CY aggregate base (CV) class 5 (P); 60 EA drill & grout reinf bar (epoxy coated); 280 gallon bituminous material for tack coat; 660 TN type sp 9. 5 and 12. 5 wear course mix; 4000 SF 6" concrete walk; 230 LF concrete curb & gutter, design b618; 28 SY 8" concrete driveway pavement; 88 SF truncated domes; 49 SF sign panels type c; 500 LF 4" solid line multi-component; 280 SF crosswalk multi-component ground in; 2 EA remove drainage structure; 1 EA remove box culvert end section; 100 LF remove pipe sewer or culvert; 1 EA 6x4 precast concrete box culvert end section; 8 LF 6x4 precast concrete box culvert; 8 LF 28" span rc pipe; 101 LF 18-24" storm sewer; 3 EA connect to inplace culvert or storm sewer; 55 CY random riprap Class III; see outside link for details
Posted Date
Apr 24, 2025
Due Date
May 16, 2025
Release: Apr 24, 2025
Close: May 16, 2025
3 EA clearing & grubbing; 1 EA remove bollard; 270 LF remove curb & gutter; 440 LF sawing bit or concrete pavement; 1600 SY remove bituminous pavement; 90 SY remove driveway or walk; 990 CY excavation-common (EV) (P); 980 SY geotextile fabric type 4 (P); 980 CY aggregate base (CV) class 5 (P); 60 EA drill & grout reinf bar (epoxy coated); 280 gallon bituminous material for tack coat; 660 TN type sp 9. 5 and 12. 5 wear course mix; 4000 SF 6" concrete walk; 230 LF concrete curb & gutter, design b618; 28 SY 8" concrete driveway pavement; 88 SF truncated domes; 49 SF sign panels type c; 500 LF 4" solid line multi-component; 280 SF crosswalk multi-component ground in; 2 EA remove drainage structure; 1 EA remove box culvert end section; 100 LF remove pipe sewer or culvert; 1 EA 6x4 precast concrete box culvert end section; 8 LF 6x4 precast concrete box culvert; 8 LF 28" span rc pipe; 101 LF 18-24" storm sewer; 3 EA connect to inplace culvert or storm sewer; 55 CY random riprap Class III; see outside link for details
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis