Discover Opportunities months before the RFP drops
Learn more →Work consist of 3,110 CY of roadway excavation, 13,425 SY of soil stabilization fabric, 670 SY of subgrade stabilization, 2,290 tn of asphalt concrete surface , 5,330 tn of asphalt concrete base, 685 sy of 0.25' thick pavement mill, 13 EA of remove & dispose pole, 11 EA of relocate signs to new pole, 18 EA of furnish & install new pole, 26 EA of furnish & install new sign, 3,732 LF of thermoplastic traffic stripe (6" white), 135 LF of thermoplastic traffic stripe (8" white), 3,362 LF of Thermoplastic Traffic Stripe Bicycle Buffer (Parking Permitted), 427 SF of Thermoplastic Pavement Marking. See attached file.
Posted Date
Dec 12, 2025
Due Date
Jan 22, 2026
Release: Dec 12, 2025
Close: Jan 22, 2026
Work consist of 3,110 CY of roadway excavation, 13,425 SY of soil stabilization fabric, 670 SY of subgrade stabilization, 2,290 tn of asphalt concrete surface , 5,330 tn of asphalt concrete base, 685 sy of 0.25' thick pavement mill, 13 EA of remove & dispose pole, 11 EA of relocate signs to new pole, 18 EA of furnish & install new pole, 26 EA of furnish & install new sign, 3,732 LF of thermoplastic traffic stripe (6" white), 135 LF of thermoplastic traffic stripe (8" white), 3,362 LF of Thermoplastic Traffic Stripe Bicycle Buffer (Parking Permitted), 427 SF of Thermoplastic Pavement Marking. See attached file.
AvailableThe City of Healdsburg is soliciting sealed bids for the Grove Street Underground Conversion Project (Project EL005, CIP-19-025), which involves constructing approximately 12,610 feet of utility trench and substructures for electric and communications utilities. A valid Class A California contractor’s license is required; bids must be submitted under sealed cover with required bidder’s security, and the successful bidder must provide performance and payment bonds and other required documents. A non-mandatory pre-bid meeting is scheduled for December 3, 2025 at 10:00 AM; plans and specifications are provided to registered plan holders via the City’s website.
Posted Date
Nov 21, 2025
Due Date
Jan 13, 2026
Release: Nov 21, 2025
Close: Jan 13, 2026
The City of Healdsburg is soliciting sealed bids for the Grove Street Underground Conversion Project (Project EL005, CIP-19-025), which involves constructing approximately 12,610 feet of utility trench and substructures for electric and communications utilities. A valid Class A California contractor’s license is required; bids must be submitted under sealed cover with required bidder’s security, and the successful bidder must provide performance and payment bonds and other required documents. A non-mandatory pre-bid meeting is scheduled for December 3, 2025 at 10:00 AM; plans and specifications are provided to registered plan holders via the City’s website.
AvailableWork consists of removal of the existing drainage inlet located adjacent to 900 Powell Avenue and installation of new precast drainage inlet and on-grade gutter depression.
Posted Date
Nov 13, 2025
Due Date
Dec 11, 2025
Release: Nov 13, 2025
Close: Dec 11, 2025
Work consists of removal of the existing drainage inlet located adjacent to 900 Powell Avenue and installation of new precast drainage inlet and on-grade gutter depression.
More RFPs available with Premium →
Premium
Access the largest public sector contact database
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Get complete source documentation & analysis