Discover Opportunities months before the RFP drops
Learn more →The City of Grove City, Ohio is soliciting sealed bids for its 2025 Sanitary Sewer Rehabilitation project, which includes rehabilitating approximately 2,312 LF of 8‑inch, 492 LF of 15‑inch, and 1,728 LF of 18‑inch sanitary sewer with CIPP liners, along with short liners, chemical grouting, manhole repairs, and point repairs. Bids are due by 11:00 a.m. local time on December 12, 2025 (04:00 PM UTC).
Posted Date
-
Due Date
Dec 12, 2025
Release: -
Close: Dec 12, 2025
The City of Grove City, Ohio is soliciting sealed bids for its 2025 Sanitary Sewer Rehabilitation project, which includes rehabilitating approximately 2,312 LF of 8‑inch, 492 LF of 15‑inch, and 1,728 LF of 18‑inch sanitary sewer with CIPP liners, along with short liners, chemical grouting, manhole repairs, and point repairs. Bids are due by 11:00 a.m. local time on December 12, 2025 (04:00 PM UTC).
Work includes 1 LS bypass pumping; 15 GAL chemical grouting; 3 EA manhole rehabilitated; 2,312 LF 8-in cured-in-place pipe (min. Thickness = 6.0mm); 492 LF 15-in cured-in-place pipe (min. Thickness = 7.5mm); 76 EA lateral sewer reestablished; 9 EA 8-in CIPP short liner point repair (thickness = 6. 0mm); 1 LS open cut point repair-canter court; 1 LS open cut point repair-elm street.
Posted Date
Nov 19, 2025
Due Date
Dec 12, 2025
Release: Nov 19, 2025
Close: Dec 12, 2025
Work includes 1 LS bypass pumping; 15 GAL chemical grouting; 3 EA manhole rehabilitated; 2,312 LF 8-in cured-in-place pipe (min. Thickness = 6.0mm); 492 LF 15-in cured-in-place pipe (min. Thickness = 7.5mm); 76 EA lateral sewer reestablished; 9 EA 8-in CIPP short liner point repair (thickness = 6. 0mm); 1 LS open cut point repair-canter court; 1 LS open cut point repair-elm street.
Roadway improvements includes installation of approximately 11,300 SY of realigned roadway, over 7,500 LF of continuous curb, over 2,300 LF of 12" to 30" storm sewer pipe, over 2,100 LF of water main, over 15,700 SF of asphalt shared-use path, over 2,200 SF of concrete sidewalk, culvert placement, street lighting, landscaping, and other related work.
Posted Date
Sep 3, 2025
Due Date
Sep 26, 2025
Release: Sep 3, 2025
Close: Sep 26, 2025
Roadway improvements includes installation of approximately 11,300 SY of realigned roadway, over 7,500 LF of continuous curb, over 2,300 LF of 12" to 30" storm sewer pipe, over 2,100 LF of water main, over 15,700 SF of asphalt shared-use path, over 2,200 SF of concrete sidewalk, culvert placement, street lighting, landscaping, and other related work.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis