Discover Opportunities months before the RFP drops
Learn more →The project includes a new 2 Story, 43,800 sf, Fremont PD Headquarters Building with below grade parking and sitework. Bid Package 2 scope of work includes : Excavation, reinforcing steel, decorative metal column covers, masonry, carpentry, air barrier, insulation, roofing, metal panels, sprayed fireproofing, frames/doors/hardware, coiling doors, glass/glazing, drywall, tile, ceilings, flooring, access flooring, painting/wallcovering, specialties, shades, fire suppression, above-slab plumbing, HVAC, above slab electrical, low voltage, site grading, site concrete/paving, and site fencing.
Posted Date
Nov 29, 2025
Due Date
Dec 16, 2025
Release: Nov 29, 2025
Close: Dec 16, 2025
The project includes a new 2 Story, 43,800 sf, Fremont PD Headquarters Building with below grade parking and sitework. Bid Package 2 scope of work includes : Excavation, reinforcing steel, decorative metal column covers, masonry, carpentry, air barrier, insulation, roofing, metal panels, sprayed fireproofing, frames/doors/hardware, coiling doors, glass/glazing, drywall, tile, ceilings, flooring, access flooring, painting/wallcovering, specialties, shades, fire suppression, above-slab plumbing, HVAC, above slab electrical, low voltage, site grading, site concrete/paving, and site fencing.
AvailableReplacing an existing kewanee m- 235-gg hot water boiler, provide new boiler to meet or exceed current kewanee m-235-gg hw boiler.
Posted Date
-
Due Date
Dec 16, 2025
Release: -
Close: Dec 16, 2025
Replacing an existing kewanee m- 235-gg hot water boiler, provide new boiler to meet or exceed current kewanee m-235-gg hw boiler.
AvailableSeeking a qualified firm to work with city staff to develop, design, bid, and provide construction administration services for a plan. Design and implement streetscape improvements that enhance pedestrian connectivity, safety, aesthetics, and public amenities in the north downtown corridor. Work includes construct streetscape improvements including landscaping, sidewalks/trails, accessible curb ramps, bump outs, decorative pavement, street lighting, bike racks, bollards, benches, parking/curb and gutter, columns, fencing, traffic calming features, signage, and three archways.
Posted Date
Oct 8, 2025
Due Date
Nov 7, 2025
Release: Oct 8, 2025
Close: Nov 7, 2025
Seeking a qualified firm to work with city staff to develop, design, bid, and provide construction administration services for a plan. Design and implement streetscape improvements that enhance pedestrian connectivity, safety, aesthetics, and public amenities in the north downtown corridor. Work includes construct streetscape improvements including landscaping, sidewalks/trails, accessible curb ramps, bump outs, decorative pavement, street lighting, bike racks, bollards, benches, parking/curb and gutter, columns, fencing, traffic calming features, signage, and three archways.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium