Discover Opportunities months before the RFP drops
Learn more →Removal and replacement of six monumental aluminum windows on the south elevation of the plant III filter gallery. New, built-up aluminum storefront assemblies with insulated glazing and operable awning windows will be installed in each window opening. This project includes the installation of related grout, blocking sill flashings and perimeter joint sealants per construction details. Miscellaneous stone repair may also be required at wall opening perimeters if damage is identified during existing window removal.
Posted Date
Dec 4, 2025
Due Date
Jan 8, 2026
Release: Dec 4, 2025
Close: Jan 8, 2026
Removal and replacement of six monumental aluminum windows on the south elevation of the plant III filter gallery. New, built-up aluminum storefront assemblies with insulated glazing and operable awning windows will be installed in each window opening. This project includes the installation of related grout, blocking sill flashings and perimeter joint sealants per construction details. Miscellaneous stone repair may also be required at wall opening perimeters if damage is identified during existing window removal.
AvailableFort Wayne Utilities is requesting Labor and Equipment rates for contracting various types of labor for repairs to be performed on Utilities Facilities. Labor may include, but are not limited to new pipe runs, equipment installation, repair, and small mechanical projects.
Posted Date
Nov 20, 2025
Due Date
Dec 11, 2025
Release: Nov 20, 2025
Close: Dec 11, 2025
Fort Wayne Utilities is requesting Labor and Equipment rates for contracting various types of labor for repairs to be performed on Utilities Facilities. Labor may include, but are not limited to new pipe runs, equipment installation, repair, and small mechanical projects.
Work includes approx. 650 SYS of PCCP, 7" inverted alley; 300 SYS of geogrid, type 1B, BX1200 or approved equal (undistributed) (includes excavation); 285 TON of compacted aggregate no. 53; 100 SYS of PCCP for approaches, 6" (alley drives) (undistributed); 200 SYS of hydroseed, with hydrostick tackifier or equivalent polymer for erosion control and straw mulch; 650 SYS of pavement removal; see outside link for more details.
Posted Date
Nov 20, 2025
Due Date
Dec 4, 2025
Release: Nov 20, 2025
Close: Dec 4, 2025
Work includes approx. 650 SYS of PCCP, 7" inverted alley; 300 SYS of geogrid, type 1B, BX1200 or approved equal (undistributed) (includes excavation); 285 TON of compacted aggregate no. 53; 100 SYS of PCCP for approaches, 6" (alley drives) (undistributed); 200 SYS of hydroseed, with hydrostick tackifier or equivalent polymer for erosion control and straw mulch; 650 SYS of pavement removal; see outside link for more details.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis