Learn more →This RFP is for the construction and reconditioning of Groundwater Wells 4 & 5, including the construction of a chemical feed building, installation of new water mains, and reconditioning of existing wells.
Posted Date
-
Due Date
Dec 18, 2025
Close: Dec 18, 2025
This RFP is for the construction and reconditioning of Groundwater Wells 4 & 5, including the construction of a chemical feed building, installation of new water mains, and reconditioning of existing wells.
AvailableThe work includes construction of a chemical feed building, installation of new water mains, and reconditioning of the existing wells. Site work will involve traditional development and utility construction within both City right-of-way and property, as well as GDOT rights-of-way, including demolition, grading, drainage, and erosion control. All GDOT encroachments will be properly permitted. Water main extensions will be installed using horizontal directional drilling (HDD) and open-cut trenching methods. Work includes a 4-inch DIP HDD crossing (±114 LF) and abandonment of an existing 2-inch main (±103 LF) within GDOT right-of-way. Approximately 1,400 LF of new 8-inch main will be installed, and another 1,000 LF of 8-inch main will be added. Well head lines will range from 4- to 6-inch DIP and vary in lengths. The chemical feed building will contain separate sodium hypochlorite and fluoride rooms, a pipe gallery, and associated well houses. One 12-inch and one 8-inch well will be reconditioned, tested, and equipped with permanent pumps. All facilities will be enclosed within a secure perimeter fence.
Posted Date
-
Due Date
Dec 18, 2025
Release: -
Close: Dec 18, 2025
The work includes construction of a chemical feed building, installation of new water mains, and reconditioning of the existing wells. Site work will involve traditional development and utility construction within both City right-of-way and property, as well as GDOT rights-of-way, including demolition, grading, drainage, and erosion control. All GDOT encroachments will be properly permitted. Water main extensions will be installed using horizontal directional drilling (HDD) and open-cut trenching methods. Work includes a 4-inch DIP HDD crossing (±114 LF) and abandonment of an existing 2-inch main (±103 LF) within GDOT right-of-way. Approximately 1,400 LF of new 8-inch main will be installed, and another 1,000 LF of 8-inch main will be added. Well head lines will range from 4- to 6-inch DIP and vary in lengths. The chemical feed building will contain separate sodium hypochlorite and fluoride rooms, a pipe gallery, and associated well houses. One 12-inch and one 8-inch well will be reconditioned, tested, and equipped with permanent pumps. All facilities will be enclosed within a secure perimeter fence.
AvailableThe work includes construction of a chemical feed building, installation of new water mains, and reconditioning of the existing wells. Site work will involve traditional development and utility construction within both City right-of-way and property, as well as GDOT rights-of-way, including demolition, grading, drainage, and erosion control. All GDOT encroachments will be properly permitted. Water main extensions will be installed using horizontal directional drilling (HDD) and open-cut trenching methods. Work includes a 4-inch DIP HDD crossing (±114 LF) and abandonment of an existing 2-inch main (±103 LF) within GDOT right-of-way. Approximately 1,400 LF of new 8-inch main will be installed, and another 1,000 LF of 8-inch main will be added. Well head lines will range from 4- to 6-inch DIP and vary in lengths. The chemical feed building will contain separate sodium hypochlorite and fluoride rooms, a pipe gallery, and associated well houses. One 12-inch and one 8-inch well will be reconditioned, tested, and equipped with permanent pumps. All facilities will be enclosed within a secure perimeter fence.
Posted Date
-
Due Date
Dec 18, 2025
Release: -
Close: Dec 18, 2025
The work includes construction of a chemical feed building, installation of new water mains, and reconditioning of the existing wells. Site work will involve traditional development and utility construction within both City right-of-way and property, as well as GDOT rights-of-way, including demolition, grading, drainage, and erosion control. All GDOT encroachments will be properly permitted. Water main extensions will be installed using horizontal directional drilling (HDD) and open-cut trenching methods. Work includes a 4-inch DIP HDD crossing (±114 LF) and abandonment of an existing 2-inch main (±103 LF) within GDOT right-of-way. Approximately 1,400 LF of new 8-inch main will be installed, and another 1,000 LF of 8-inch main will be added. Well head lines will range from 4- to 6-inch DIP and vary in lengths. The chemical feed building will contain separate sodium hypochlorite and fluoride rooms, a pipe gallery, and associated well houses. One 12-inch and one 8-inch well will be reconditioned, tested, and equipped with permanent pumps. All facilities will be enclosed within a secure perimeter fence.
AvailablePremium
Access the largest public sector contact database
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Get complete source documentation & analysis