Discover Opportunities months before the RFP drops
Learn more →Work includes 1 LS clearing and grubbing; 375 CY excavation; 47 CY topsoil; 421 CY seeding and mulching; 21 SY repair seeding and mulching; 2,500 EA erosion control; 10,881 SF 4" concrete walk including 4" aggregate base; 75 SF 9" concrete walk including 4" aggregate base; 50 LF type 6 curb; 2 EA manhole adjusted to grade; 12 LF type 6 curb, 6" to 12" curb height (see detail); 363 LF retaining wall, 24" wall height.
Posted Date
Nov 21, 2025
Due Date
Dec 15, 2025
Release: Nov 21, 2025
Close: Dec 15, 2025
Work includes 1 LS clearing and grubbing; 375 CY excavation; 47 CY topsoil; 421 CY seeding and mulching; 21 SY repair seeding and mulching; 2,500 EA erosion control; 10,881 SF 4" concrete walk including 4" aggregate base; 75 SF 9" concrete walk including 4" aggregate base; 50 LF type 6 curb; 2 EA manhole adjusted to grade; 12 LF type 6 curb, 6" to 12" curb height (see detail); 363 LF retaining wall, 24" wall height.
AvailableWork include 2,696' install one (1) 2" conduit; 4,120' install tracer wire in conduit; 11 EA install handhold; 6 EA install route marker posts; 6,964' fiber optic cable, as per plan (underground); 589' fiber optic cable, as per plan (overhead); 11 EA materials hh with lid 24"x36"x30"; 4 EA slack installation; 100' install new conduit (emt up to 2") - interior; 180' bridge attachment (2" ridgid conduit).
Posted Date
Nov 14, 2025
Due Date
Dec 1, 2025
Release: Nov 14, 2025
Close: Dec 1, 2025
Work include 2,696' install one (1) 2" conduit; 4,120' install tracer wire in conduit; 11 EA install handhold; 6 EA install route marker posts; 6,964' fiber optic cable, as per plan (underground); 589' fiber optic cable, as per plan (overhead); 11 EA materials hh with lid 24"x36"x30"; 4 EA slack installation; 100' install new conduit (emt up to 2") - interior; 180' bridge attachment (2" ridgid conduit).
Work includes signage design, construction, and installation services for a package of signs within the Town Center area. The sign package includes four gateway signs, two monument location signs, and four wayfinding sign clusters, all to be designed per existing sign standards.
Posted Date
Jul 14, 2025
Due Date
Aug 8, 2025
Release: Jul 14, 2025
Close: Aug 8, 2025
Work includes signage design, construction, and installation services for a package of signs within the Town Center area. The sign package includes four gateway signs, two monument location signs, and four wayfinding sign clusters, all to be designed per existing sign standards.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis