Discover Opportunities months before the RFP drops
Learn more →Abandon and relocate an existing 6-inch waterline crossing; Tie into the existing 8-inch main on Laurel Street; Extend across the southern boundary of the Murphy Gas Station property; This alignment will eliminate the vertical conflict with the storm drain, allow abandonment of the existing 6-inch line, and maintain service to adjacent properties, including re-supply to an existing fire hydrant. The proposed waterline will be approx. 490 LF in length and installed at a depth of 5 feet or shallower.
Posted Date
Nov 29, 2025
Due Date
Dec 15, 2025
Release: Nov 29, 2025
Close: Dec 15, 2025
Abandon and relocate an existing 6-inch waterline crossing; Tie into the existing 8-inch main on Laurel Street; Extend across the southern boundary of the Murphy Gas Station property; This alignment will eliminate the vertical conflict with the storm drain, allow abandonment of the existing 6-inch line, and maintain service to adjacent properties, including re-supply to an existing fire hydrant. The proposed waterline will be approx. 490 LF in length and installed at a depth of 5 feet or shallower.
AvailableSeeking eligible banking institutions to serve as the city's depository
Posted Date
Oct 25, 2025
Due Date
Dec 10, 2025
Release: Oct 25, 2025
Close: Dec 10, 2025
Seeking eligible banking institutions to serve as the city's depository
Release: Jul 28, 2024
Close: Aug 21, 2024
Provide future land use plan.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis