Discover Opportunities months before the RFP drops
Learn more →Water Main Extension. Work includes 1,363 LF of Directional Bore & Install 6" PE SDR 11 Water Main; 539 LF of Directional Bore & Install 8" PE SDR 11 Water Main; 130 LF of Directional Bore & Install 8" PE SDR 9 Water Main; 2 EA 8" Gate Valve & Box; 4 EA 6" Gate Valve & Box; 3 EA Fire Hydrant.
Posted Date
Dec 13, 2025
Due Date
Jan 6, 2026
Release: Dec 13, 2025
Close: Jan 6, 2026
Water Main Extension. Work includes 1,363 LF of Directional Bore & Install 6" PE SDR 11 Water Main; 539 LF of Directional Bore & Install 8" PE SDR 11 Water Main; 130 LF of Directional Bore & Install 8" PE SDR 9 Water Main; 2 EA 8" Gate Valve & Box; 4 EA 6" Gate Valve & Box; 3 EA Fire Hydrant.
AvailableWork includes to construct multi-unit hangar. 1 LS mobilization; 1 LS low profile aviation barricades; 1 LS temporary air and water pollution, soil erosion, and siltation control; 1,660 CY remove, stockpile, and replace topsoil (6" thickness); 1 LS excavation, embankment, and off-site borrow; 5140 SY triaxial geogrid; 5140 SY 6" crushed aggregate base course; 5060 SY 6" P.C. Concrete surface course; 1 LS construct multi-unit hangar including fire protection, foundation, and slab; 300 SF marking with reflective media; 600 SF marking without reflective media; 1690 SY solid slab sodding and watering until established; 1 LS exterior waterline for fire protection.
Posted Date
Nov 14, 2025
Due Date
Dec 4, 2025
Release: Nov 14, 2025
Close: Dec 4, 2025
Work includes to construct multi-unit hangar. 1 LS mobilization; 1 LS low profile aviation barricades; 1 LS temporary air and water pollution, soil erosion, and siltation control; 1,660 CY remove, stockpile, and replace topsoil (6" thickness); 1 LS excavation, embankment, and off-site borrow; 5140 SY triaxial geogrid; 5140 SY 6" crushed aggregate base course; 5060 SY 6" P.C. Concrete surface course; 1 LS construct multi-unit hangar including fire protection, foundation, and slab; 300 SF marking with reflective media; 600 SF marking without reflective media; 1690 SY solid slab sodding and watering until established; 1 LS exterior waterline for fire protection.
Burns well field for the agricultural purposes containing in all approx. one hundred sixty five (165) acres, more or less.
Posted Date
Oct 11, 2025
Due Date
Nov 4, 2025
Release: Oct 11, 2025
Close: Nov 4, 2025
Burns well field for the agricultural purposes containing in all approx. one hundred sixty five (165) acres, more or less.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis