Discover Opportunities months before the RFP drops
Learn more →Street improvements.
Posted Date
Dec 10, 2025
Due Date
Jan 15, 2026
Release: Dec 10, 2025
Close: Jan 15, 2026
Street improvements.
AvailableProvide road construction materials. Base material (1" flex base); select fill; chat/sand/ man sand; hot mix - hot lay; hot mix - cold lay; #3 cover stone; #4 cover stone.
Posted Date
Jul 15, 2025
Due Date
Aug 15, 2025
Release: Jul 15, 2025
Close: Aug 15, 2025
Provide road construction materials. Base material (1" flex base); select fill; chat/sand/ man sand; hot mix - hot lay; hot mix - cold lay; #3 cover stone; #4 cover stone.
Work includes demolition of existing asphalt and the installation of 6" concrete paving at the fire station/utility building. Phase one includes approximately 12,750 square feet of paving and 270 linear feet of curb. Asphalt removal shall include neat saw cut adjacent to new paving and at other location as directed by the city. Reinforcing steel (3- #3 bars) shall be required in all paving and curb and gutter. Spacing shall be 24" except where noted on the plans. Control joints shall be cut at intervals not exceeding 15 feet. Expansion joints shall be installed at intervals not exceeding 100 feet. Concrete shall achieve a compressive strength of 3,600 psi at 28 days. See outside link.
Posted Date
Jul 15, 2025
Due Date
Aug 8, 2025
Release: Jul 15, 2025
Close: Aug 8, 2025
Work includes demolition of existing asphalt and the installation of 6" concrete paving at the fire station/utility building. Phase one includes approximately 12,750 square feet of paving and 270 linear feet of curb. Asphalt removal shall include neat saw cut adjacent to new paving and at other location as directed by the city. Reinforcing steel (3- #3 bars) shall be required in all paving and curb and gutter. Spacing shall be 24" except where noted on the plans. Control joints shall be cut at intervals not exceeding 15 feet. Expansion joints shall be installed at intervals not exceeding 100 feet. Concrete shall achieve a compressive strength of 3,600 psi at 28 days. See outside link.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis