Discover Opportunities months before the RFP drops
Learn more →Works includes house all public works operations. Exterior site work is not included in the building construction contract. The contractor of record will be expected to perform miscellaneous tasks, such as the installation of rain drains and stormwater facilities, sanitary sewer connections, fire suppression connection, demolition, general excavation, off-haul of materials, and paving.
Posted Date
Dec 2, 2025
Due Date
Dec 18, 2025
Release: Dec 2, 2025
Close: Dec 18, 2025
Works includes house all public works operations. Exterior site work is not included in the building construction contract. The contractor of record will be expected to perform miscellaneous tasks, such as the installation of rain drains and stormwater facilities, sanitary sewer connections, fire suppression connection, demolition, general excavation, off-haul of materials, and paving.
AvailableThe project contemplated consists of replacement of four oxidation surface aerator belt drives with shaft mounted direct drives, replacement of aerator shaft bearings, installation of 14 owner furnished aerator disks onto two shaft sections, installation of three variable frequency drives (one variable frequency drive is existing), installation of an oxidation reduction probe into channel 1 of the oxidation ditch, and associated electrical and instrumentation and control elements.
Posted Date
Dec 1, 2025
Due Date
Dec 18, 2025
Release: Dec 1, 2025
Close: Dec 18, 2025
The project contemplated consists of replacement of four oxidation surface aerator belt drives with shaft mounted direct drives, replacement of aerator shaft bearings, installation of 14 owner furnished aerator disks onto two shaft sections, installation of three variable frequency drives (one variable frequency drive is existing), installation of an oxidation reduction probe into channel 1 of the oxidation ditch, and associated electrical and instrumentation and control elements.
AvailableProject contemplated consists of a new 16" ductile iron transmission main and 10" ductile watermain and includes asphalt and concrete restoration and associated water valves, fittings, services, and relevant appurtenances.
Posted Date
Nov 26, 2025
Due Date
Jan 15, 2026
Release: Nov 26, 2025
Close: Jan 15, 2026
Project contemplated consists of a new 16" ductile iron transmission main and 10" ductile watermain and includes asphalt and concrete restoration and associated water valves, fittings, services, and relevant appurtenances.
AvailableMore RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis