Discover Opportunities months before the RFP drops
Learn more →The project includes a new wastewater treatment plant consisting of: influent splitter structure, raw sewage lift station; headworks building with screening, grit, and odor control equipment; two (2) basin sbr treatment system with blowers, mixers, and decanters; uv disinfection system; low-profile cascade aeration system; outfall line; non-potable water system; sludge processing system including aerobic digester, blowers, mixers, decanter, sludge pumps, centrifuge dewatering, polymer feed, and conveyor system; chemical feed system for phosphorus removal; electrical building; emergency generator mandatory alternate lab and office building; mandatory alternate maintenance building.
Posted Date
Dec 5, 2025
Due Date
Feb 3, 2026
Release: Dec 5, 2025
Close: Feb 3, 2026
The project includes a new wastewater treatment plant consisting of: influent splitter structure, raw sewage lift station; headworks building with screening, grit, and odor control equipment; two (2) basin sbr treatment system with blowers, mixers, and decanters; uv disinfection system; low-profile cascade aeration system; outfall line; non-potable water system; sludge processing system including aerobic digester, blowers, mixers, decanter, sludge pumps, centrifuge dewatering, polymer feed, and conveyor system; chemical feed system for phosphorus removal; electrical building; emergency generator mandatory alternate lab and office building; mandatory alternate maintenance building.
AvailableThe project includes approx. 6,900 LF of new 24" dia. water main including connection to existing main, new hydrants and valves, directional drilling across a local road and drainage way, and all other work required for the completion of the project.
Posted Date
Nov 21, 2025
Due Date
Dec 16, 2025
Release: Nov 21, 2025
Close: Dec 16, 2025
The project includes approx. 6,900 LF of new 24" dia. water main including connection to existing main, new hydrants and valves, directional drilling across a local road and drainage way, and all other work required for the completion of the project.
AvailableRelease: Oct 15, 2025
Close: Nov 7, 2025
Sale of a Property.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis