Discover Opportunities months before the RFP drops
Learn more →The City of Corvallis Public Works Department seeks a consultant to conduct an ADA self-evaluation and develop an ADA Transition Plan for the public right-of-way, including curb ramps, sidewalks, transit stops, and pedestrian pushbuttons at signals. The work includes evaluating existing standards, procedures, and infrastructure, and recommending changes to improve accessibility with prioritization and cost estimates. Deliverables include draft and final reports and public engagement components to support plan development and adoption.
Posted Date
Oct 15, 2025
Due Date
Jan 6, 2026
Release: Oct 15, 2025
Close: Jan 6, 2026
The City of Corvallis Public Works Department seeks a consultant to conduct an ADA self-evaluation and develop an ADA Transition Plan for the public right-of-way, including curb ramps, sidewalks, transit stops, and pedestrian pushbuttons at signals. The work includes evaluating existing standards, procedures, and infrastructure, and recommending changes to improve accessibility with prioritization and cost estimates. Deliverables include draft and final reports and public engagement components to support plan development and adoption.
AvailableThe City of Corvallis is soliciting sealed bids for construction of the Wastewater Reclamation Plant Secondary Process Improvements, Phase 2. This project includes the installation of RAS and WAS pumps, piping, precast utility vaults, paving, and electrical/instrumentation work, along with the construction of walls and building features at the WAS station. The scope involves installing pre-purchased RAS pumps and performing associated civil, mechanical, and electrical improvements as per contract requirements. Bidders must submit sealed bids according to the City's instructions on the buyer site.
Posted Date
Dec 10, 2025
Due Date
Jan 22, 2026
Release: Dec 10, 2025
Close: Jan 22, 2026
The City of Corvallis is soliciting sealed bids for construction of the Wastewater Reclamation Plant Secondary Process Improvements, Phase 2. This project includes the installation of RAS and WAS pumps, piping, precast utility vaults, paving, and electrical/instrumentation work, along with the construction of walls and building features at the WAS station. The scope involves installing pre-purchased RAS pumps and performing associated civil, mechanical, and electrical improvements as per contract requirements. Bidders must submit sealed bids according to the City's instructions on the buyer site.
AvailablePerform permitting, hydraulic analysis, and prefabricated bridge selection services for a proposed 320' multi-use path crossing a 60' span of Dixon Creek within FEMA regulatory floodway and a locally protected riparian corridor in the Porter Park area.
Posted Date
Nov 17, 2025
Due Date
Dec 17, 2025
Release: Nov 17, 2025
Close: Dec 17, 2025
Perform permitting, hydraulic analysis, and prefabricated bridge selection services for a proposed 320' multi-use path crossing a 60' span of Dixon Creek within FEMA regulatory floodway and a locally protected riparian corridor in the Porter Park area.
AvailableMore RFPs available with Premium →
Premium
Access the largest public sector contact database
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Get complete source documentation & analysis