Discover Opportunities months before the RFP drops
Learn more →Work includes remove three existing underground unleaded tanks and three fuel dispensers. Installing new solenoid valves and fuel meters on dispensers at the golf course maintenance building, the parks maintenance building.
Posted Date
Dec 10, 2025
Due Date
Jan 27, 2026
Release: Dec 10, 2025
Close: Jan 27, 2026
Work includes remove three existing underground unleaded tanks and three fuel dispensers. Installing new solenoid valves and fuel meters on dispensers at the golf course maintenance building, the parks maintenance building.
AvailableThe City of Cortez is seeking an Architecture/Engineering (A/E) team to provide facility assessment, as-builts including a 3D model, and an opinion of probable cost for the Empire Electric Association office building. This Request for Quotation (RFQ GS-OABR-25) is for professional services. The bidding period is from November 26, 2025, to December 29, 2025.
Posted Date
Nov 26, 2025
Due Date
Dec 29, 2025
Release: Nov 26, 2025
Close: Dec 29, 2025
The City of Cortez is seeking an Architecture/Engineering (A/E) team to provide facility assessment, as-builts including a 3D model, and an opinion of probable cost for the Empire Electric Association office building. This Request for Quotation (RFQ GS-OABR-25) is for professional services. The bidding period is from November 26, 2025, to December 29, 2025.
AvailableA/E services to perform a facility assessment and engineer's opinion of probable cost for the 17,040 SF building at 801 North Broadway, evaluating two use cases (city administration or police department). Required deliverables include existing-conditions as-builts and a 3D model, programming, conceptual layouts, coordination with City departments, and phase cost estimates.
Posted Date
Nov 26, 2025
Due Date
Dec 29, 2025
Release: Nov 26, 2025
Close: Dec 29, 2025
A/E services to perform a facility assessment and engineer's opinion of probable cost for the 17,040 SF building at 801 North Broadway, evaluating two use cases (city administration or police department). Required deliverables include existing-conditions as-builts and a 3D model, programming, conceptual layouts, coordination with City departments, and phase cost estimates.
AvailableMore RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis