Discover Opportunities months before the RFP drops
Learn more →The City of Cocoa Beach is soliciting proposals to replace existing ADA dune crossovers at South 7th Street and Flagler Lane, including demolition and construction of new ADA-compliant timber crossovers with landings, ramps, handrails, and structural supports. The project spans approximately 237 ft at South 7th Street and 222 ft at Flagler Lane and specifies Southern Yellow Pine pressure-treated timber per project drawings and applicable codes. Documents (plans, RFP/specifications, legal ad) are distributed via DemandStar and a non-mandatory pre-bid conference is scheduled for December 12, 2025.
Posted Date
Nov 23, 2025
Due Date
Jan 2, 2026
Release: Nov 23, 2025
Close: Jan 2, 2026
The City of Cocoa Beach is soliciting proposals to replace existing ADA dune crossovers at South 7th Street and Flagler Lane, including demolition and construction of new ADA-compliant timber crossovers with landings, ramps, handrails, and structural supports. The project spans approximately 237 ft at South 7th Street and 222 ft at Flagler Lane and specifies Southern Yellow Pine pressure-treated timber per project drawings and applicable codes. Documents (plans, RFP/specifications, legal ad) are distributed via DemandStar and a non-mandatory pre-bid conference is scheduled for December 12, 2025.
AvailableConstruction contract to demolish (or replace) and build two ADA‑compliant dune crossovers at South 7th Street (~237 ft) and Flagler Lane (~222 ft), supplying all labor, materials, equipment; structures specified as pressure‑treated Southern Yellow Pine with 6" diameter wood piles (10' embedment), 316 stainless‑steel hardware and stainless handrails, ADA ramps/landings, and required shop drawings — proposals must include lump‑sum and schedule of unit prices.
Posted Date
Nov 23, 2025
Due Date
Jan 2, 2026
Release: Nov 23, 2025
Close: Jan 2, 2026
Construction contract to demolish (or replace) and build two ADA‑compliant dune crossovers at South 7th Street (~237 ft) and Flagler Lane (~222 ft), supplying all labor, materials, equipment; structures specified as pressure‑treated Southern Yellow Pine with 6" diameter wood piles (10' embedment), 316 stainless‑steel hardware and stainless handrails, ADA ramps/landings, and required shop drawings — proposals must include lump‑sum and schedule of unit prices.
AvailableThis project includes approximately 141 acres of underwater thin-layer muck capping and construction of 1.6 acres of habitat caps, along with related mobilization, site controls, and restoration activities as further detailed in the Bidding Documents.
Posted Date
Aug 31, 2025
Due Date
Oct 31, 2025
Release: Aug 31, 2025
Close: Oct 31, 2025
This project includes approximately 141 acres of underwater thin-layer muck capping and construction of 1.6 acres of habitat caps, along with related mobilization, site controls, and restoration activities as further detailed in the Bidding Documents.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis