Learn more →Work includes the installation of approx 6,266 LF of 8" di waterline, 92 LF of 16" steel casing pipe, 1 fire hydrant assembly, and related appurtenances.
Posted Date
Dec 15, 2025
Due Date
Jan 8, 2026
Release: Dec 15, 2025
Close: Jan 8, 2026
Work includes the installation of approx 6,266 LF of 8" di waterline, 92 LF of 16" steel casing pipe, 1 fire hydrant assembly, and related appurtenances.
AvailableThe scope of work includes the installation of approx 10,256 LF of 24" DI raw waterline, 50 LF of 48" steel casing pipe, 7 air release valve assemblies, and related appurtenances.
Posted Date
Jun 9, 2025
Due Date
Jun 26, 2025
Release: Jun 9, 2025
Close: Jun 26, 2025
The scope of work includes the installation of approx 10,256 LF of 24" DI raw waterline, 50 LF of 48" steel casing pipe, 7 air release valve assemblies, and related appurtenances.
The scope of work includes the installation of 4 new raw water intake pumps and VFDs, HVAC equipment, and related appurtenances. This project is intended to increase supply capacity to the water treatment plant by replacing the four existing 250 HP raw water intake pumps with new 400 HP pumps.
Posted Date
Jun 9, 2025
Due Date
Jul 10, 2025
Release: Jun 9, 2025
Close: Jul 10, 2025
The scope of work includes the installation of 4 new raw water intake pumps and VFDs, HVAC equipment, and related appurtenances. This project is intended to increase supply capacity to the water treatment plant by replacing the four existing 250 HP raw water intake pumps with new 400 HP pumps.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis