Discover Opportunities months before the RFP drops
Learn more →Provide construction inspection services for a project consisting of approx 35 pedestrian curb ramp replacements including curb line adjustments, markings, and other associated work.
Posted Date
Dec 10, 2025
Due Date
Jan 12, 2026
Release: Dec 10, 2025
Close: Jan 12, 2026
Provide construction inspection services for a project consisting of approx 35 pedestrian curb ramp replacements including curb line adjustments, markings, and other associated work.
AvailableThe City of Bloomington, Indiana (Board of Public Works) seeks sealed bids for the Kirkwood Bollard Footing Installation Project to install crash-rated bollard footings and sleeves. Bids are submitted electronically through the City’s OpenGov procurement portal and this is an Invitation for Bid (sealed pricing). The posting includes project plans and forms on the portal and the bid submission deadline is Dec 15, 2025 at 12:00 PM Eastern.
Posted Date
Dec 3, 2025
Due Date
Dec 15, 2025
Release: Dec 3, 2025
Close: Dec 15, 2025
The City of Bloomington, Indiana (Board of Public Works) seeks sealed bids for the Kirkwood Bollard Footing Installation Project to install crash-rated bollard footings and sleeves. Bids are submitted electronically through the City’s OpenGov procurement portal and this is an Invitation for Bid (sealed pricing). The posting includes project plans and forms on the portal and the bid submission deadline is Dec 15, 2025 at 12:00 PM Eastern.
AvailableContractor shall commence the following scope for Lot 1, Lot 3, Lot 5. Mill 1 ½ inches so not to change the finished elevation when resurfaced; Apply 1 ½" of surface material after the mill; ADA Meter poles will need to stay however lowered to 48 inches in all lots/if removed, they will need to be replaced (contact parking prior to removal of any meter heads); ADA markings must be replaced; Straighten all signage poles in lots ; Re-stripe all traffic control ground paint markings, including all parking stalls; All striping back to previous detail; If bumper blocks are to be removed then reset after the placement of surface; If signage is removed all signage needs to be reinstalled; Replacement of bumper blocks if broken during removal; Clear all unwanted vegetation if present; Provide barricade for complete lot closure; Removal of all capped or not capped meter poles (base treatment as needed to fill the voids). See outside link.
Posted Date
Nov 23, 2025
Due Date
Dec 15, 2025
Release: Nov 23, 2025
Close: Dec 15, 2025
Contractor shall commence the following scope for Lot 1, Lot 3, Lot 5. Mill 1 ½ inches so not to change the finished elevation when resurfaced; Apply 1 ½" of surface material after the mill; ADA Meter poles will need to stay however lowered to 48 inches in all lots/if removed, they will need to be replaced (contact parking prior to removal of any meter heads); ADA markings must be replaced; Straighten all signage poles in lots ; Re-stripe all traffic control ground paint markings, including all parking stalls; All striping back to previous detail; If bumper blocks are to be removed then reset after the placement of surface; If signage is removed all signage needs to be reinstalled; Replacement of bumper blocks if broken during removal; Clear all unwanted vegetation if present; Provide barricade for complete lot closure; Removal of all capped or not capped meter poles (base treatment as needed to fill the voids). See outside link.
AvailableMore RFPs available with Premium →
Premium
Access the largest public sector contact database
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Get complete source documentation & analysis