Discover Opportunities months before the RFP drops
Learn more →Provide and install screen at the prison pump station facility.
Posted Date
Dec 4, 2025
Due Date
Dec 16, 2025
Release: Dec 4, 2025
Close: Dec 16, 2025
Provide and install screen at the prison pump station facility.
AvailableProject Includes rehabilitation of concrete rapid mix basin, replacement of sedimentation basins tube settlers, anthracite coal and sand media in 4 filters, all hydraulic operated valves with motor operated valves, filter control panels, high service pump VFD controller, filter effluent flow meters, 3-8" raw water intake ball check valves, furnishing and installing chemical transfer and feed pumps and day tanks, furnish and install additional SCADA computer, furnish additional lab equipment, clean sediment out of clearwell, furnish and install emergency generator and replace all ventilation fans and louvers. See outside link.
Posted Date
-
Due Date
Oct 29, 2025
Close: Oct 29, 2025
Project Includes rehabilitation of concrete rapid mix basin, replacement of sedimentation basins tube settlers, anthracite coal and sand media in 4 filters, all hydraulic operated valves with motor operated valves, filter control panels, high service pump VFD controller, filter effluent flow meters, 3-8" raw water intake ball check valves, furnishing and installing chemical transfer and feed pumps and day tanks, furnish and install additional SCADA computer, furnish additional lab equipment, clean sediment out of clearwell, furnish and install emergency generator and replace all ventilation fans and louvers. See outside link.
Provide flood-proof electrical outlet upgrade includes disconnecting and removal of the existing electrical outlets currently installed at the base of approx 40 lamp posts; installation of new electrical outlets midway up each post, above known flood levels. All new outlets must be housed in weatherproof and waterproof enclosures rated for outdoor use. Ensure all new electrical work meets state and local code requirements. Properly dispose of any removed materials.
Posted Date
Jul 3, 2025
Due Date
Jul 14, 2025
Release: Jul 3, 2025
Close: Jul 14, 2025
Provide flood-proof electrical outlet upgrade includes disconnecting and removal of the existing electrical outlets currently installed at the base of approx 40 lamp posts; installation of new electrical outlets midway up each post, above known flood levels. All new outlets must be housed in weatherproof and waterproof enclosures rated for outdoor use. Ensure all new electrical work meets state and local code requirements. Properly dispose of any removed materials.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis