Discover Opportunities months before the RFP drops
Learn more →Work includes wastewater treatment plant improvements, fine screens, process instrumentation, process mixers, fine bubble diffusers, aeration piping and equipment, process blowers, process pumps, membrane system.
Posted Date
Nov 28, 2025
Due Date
Dec 22, 2025
Release: Nov 28, 2025
Close: Dec 22, 2025
Work includes wastewater treatment plant improvements, fine screens, process instrumentation, process mixers, fine bubble diffusers, aeration piping and equipment, process blowers, process pumps, membrane system.
AvailableProvide design-build services. Design and construct two covered pavilions located on the visitor side of the football field. Each pavilion shall be designed for multipurpose community and spectator use, with durable, low-maintenance materials suitable for outdoor public settings. Include concrete pads, accessible walkways, and appropriate site grading. Provide electrical service, lighting, and conduit for future security cameras if applicable. Design shall comply with the florida building code (fbc), ada standards for accessible design, and all local permitting requirements.
Posted Date
Nov 5, 2025
Due Date
Dec 16, 2025
Release: Nov 5, 2025
Close: Dec 16, 2025
Provide design-build services. Design and construct two covered pavilions located on the visitor side of the football field. Each pavilion shall be designed for multipurpose community and spectator use, with durable, low-maintenance materials suitable for outdoor public settings. Include concrete pads, accessible walkways, and appropriate site grading. Provide electrical service, lighting, and conduit for future security cameras if applicable. Design shall comply with the florida building code (fbc), ada standards for accessible design, and all local permitting requirements.
AvailableDesign-build: work includes remodel one (1) existing bathroom within the fire station into two (2) fully functional bathrooms designed for firefighter use.
Posted Date
Nov 5, 2025
Due Date
Dec 8, 2025
Release: Nov 5, 2025
Close: Dec 8, 2025
Design-build: work includes remodel one (1) existing bathroom within the fire station into two (2) fully functional bathrooms designed for firefighter use.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis