Learn more →Construction improvements include approx., 40,500 CY of class 10 excavation, 5,600 CY of Class 13 excavation, 7,200 CY of topsoil, 450 LF of dual cell 4'x10' RCB culvert, 150 LF of single cell 4'x10' RCB culvert, 1,375 SY of 8" thick double-reinforced PCC street pavement, 1,150 SY of 8" thick PCC street pavement, and 1,150 SY of 7" thick PCC street pavement. Additional construction improvements include approx., 1,275 SY of 6" thick PCC shared use path, 1,375 SY of 5" thick PCC shared use path, 900 SY of 4" thick PCC sidewalk, 30 storm sewer structures, 1,750 LF of storm sewer, 750 LF of water main, 100 LF of sanitary sewer, 900 LF of subdrain, 4,500 SY of subgrade preparation, and 4,500 SY of modified subbase. Other associated improvements include clearing and grubbing, temporary shoring, temporary water main, temporary sidewalk, temporary and permanent erosion control, temporary and permanent surface restoration, pavement markings and signs, temporary traffic control, mobilization, and miscellaneous associated work necessary to complete the project.
Posted Date
Nov 18, 2025
Due Date
Dec 9, 2025
Release: Nov 18, 2025
Close: Dec 9, 2025
Construction improvements include approx., 40,500 CY of class 10 excavation, 5,600 CY of Class 13 excavation, 7,200 CY of topsoil, 450 LF of dual cell 4'x10' RCB culvert, 150 LF of single cell 4'x10' RCB culvert, 1,375 SY of 8" thick double-reinforced PCC street pavement, 1,150 SY of 8" thick PCC street pavement, and 1,150 SY of 7" thick PCC street pavement. Additional construction improvements include approx., 1,275 SY of 6" thick PCC shared use path, 1,375 SY of 5" thick PCC shared use path, 900 SY of 4" thick PCC sidewalk, 30 storm sewer structures, 1,750 LF of storm sewer, 750 LF of water main, 100 LF of sanitary sewer, 900 LF of subdrain, 4,500 SY of subgrade preparation, and 4,500 SY of modified subbase. Other associated improvements include clearing and grubbing, temporary shoring, temporary water main, temporary sidewalk, temporary and permanent erosion control, temporary and permanent surface restoration, pavement markings and signs, temporary traffic control, mobilization, and miscellaneous associated work necessary to complete the project.
Constructing 3,622 LF of 24" sanitary sewer, with 63 LF being encased in concrete. In addition, the improvements include permanent erosion control measures within the stream and along the streambank at creek crossing, sheet piling, temporary erosion control measures throughout construction, permanent and temporary seeding, final surface restoration, tile line location and repair, removal and replacement of field fence, and temporary fencing.
Posted Date
Nov 18, 2025
Due Date
Dec 9, 2025
Release: Nov 18, 2025
Close: Dec 9, 2025
Constructing 3,622 LF of 24" sanitary sewer, with 63 LF being encased in concrete. In addition, the improvements include permanent erosion control measures within the stream and along the streambank at creek crossing, sheet piling, temporary erosion control measures throughout construction, permanent and temporary seeding, final surface restoration, tile line location and repair, removal and replacement of field fence, and temporary fencing.
Construction improvements include approx., 4,158 SY of 9" thick PCC class C-sud street pavement, 329 lf of water main, 1,331 LF of storm sewer, 2,356 LF of subdrain, class 10 excavation, subgrade preparation, modified subbase, sidewalks, pavement markings, traffic signs, temporary traffic control, erosion control, final surface restoration, and miscellaneous associated work necessary to complete the project.
Posted Date
Sep 16, 2025
Due Date
Oct 14, 2025
Release: Sep 16, 2025
Close: Oct 14, 2025
Construction improvements include approx., 4,158 SY of 9" thick PCC class C-sud street pavement, 329 lf of water main, 1,331 LF of storm sewer, 2,356 LF of subdrain, class 10 excavation, subgrade preparation, modified subbase, sidewalks, pavement markings, traffic signs, temporary traffic control, erosion control, final surface restoration, and miscellaneous associated work necessary to complete the project.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis