Discover Opportunities months before the RFP drops
Learn more →Work includes approx 1,330 LF of 24" nominal diameter drill hole; 500 LF of 14" nominal diameter drill hole; 1,330 LF of 18" nominal diameter casing; 700 LF of 24" nominal diameter casing; 2,820 Sack of grouting; See outside link.
Posted Date
Nov 20, 2025
Due Date
Dec 16, 2025
Release: Nov 20, 2025
Close: Dec 16, 2025
Work includes approx 1,330 LF of 24" nominal diameter drill hole; 500 LF of 14" nominal diameter drill hole; 1,330 LF of 18" nominal diameter casing; 700 LF of 24" nominal diameter casing; 2,820 Sack of grouting; See outside link.
AvailableFurnishing all labor, equipment, and materials for the construction of Water System Improvements 2024, Adventure land Drive Water Transmission Main project, which consists of: 1.Installation of approximately 335 linear feet of new 16-inch diameter water main. 2.Installation of approximately 290 linear feet of new 16-inch diameter restrained joint water main by trenchless construction. 3.Water main appurtenances including new valves, fittings, fire hydrants, connections to existing water mains, and removal of existing water main. 4.Pavement removal and replacement, including 23 square yards of new shared use path, and related appurtenances. 5.Temporary traffic control. 6.Erosion and sediment control, including hydraulic seeding, linear erosion control, and SWPPP management. 7.Trench foundation, unsuitable backfill replacement, trench compaction testing, topsoil respread and mobilization.
Posted Date
Nov 19, 2025
Due Date
Dec 9, 2025
Release: Nov 19, 2025
Close: Dec 9, 2025
Furnishing all labor, equipment, and materials for the construction of Water System Improvements 2024, Adventure land Drive Water Transmission Main project, which consists of: 1.Installation of approximately 335 linear feet of new 16-inch diameter water main. 2.Installation of approximately 290 linear feet of new 16-inch diameter restrained joint water main by trenchless construction. 3.Water main appurtenances including new valves, fittings, fire hydrants, connections to existing water mains, and removal of existing water main. 4.Pavement removal and replacement, including 23 square yards of new shared use path, and related appurtenances. 5.Temporary traffic control. 6.Erosion and sediment control, including hydraulic seeding, linear erosion control, and SWPPP management. 7.Trench foundation, unsuitable backfill replacement, trench compaction testing, topsoil respread and mobilization.
Exterior overcoat and a new logo for the water storage tank, 1,000,000-gallon welded steel standpipe water storage tank.
Posted Date
Sep 16, 2025
Due Date
Sep 30, 2025
Release: Sep 16, 2025
Close: Sep 30, 2025
Exterior overcoat and a new logo for the water storage tank, 1,000,000-gallon welded steel standpipe water storage tank.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis