Discover Opportunities months before the RFP drops
Learn more →Development consultant services.
Posted Date
Sep 19, 2025
Due Date
Jan 14, 2026
Release: Sep 19, 2025
Close: Jan 14, 2026
Development consultant services.
AvailableWork include 100 lf trench excavation; 250 sy removal and disposal of asphaltic pavement & base courses; 150 sy removal and disposal of concrete pavement & base courses, all thickness (including saw cutting (up to a depth of 10 ), and curb/gutter); 25 cy backfill of 57a stone with 95% compaction or greater; 3 ea plug existing sanitary sewer main with watertight clamp; 4 ea remove and dispose existing sanitary sewer lateral w/ disconnection of private lateral cleanout; 150 lf installation of 4" pvc (sdr26) sanitary sewer lateral up to 6' deep; installation of 6" pvc (sdr26) sanitary sewer lateral up to 6' deep.
Posted Date
Nov 5, 2025
Due Date
Jan 13, 2026
Release: Nov 5, 2025
Close: Jan 13, 2026
Work include 100 lf trench excavation; 250 sy removal and disposal of asphaltic pavement & base courses; 150 sy removal and disposal of concrete pavement & base courses, all thickness (including saw cutting (up to a depth of 10 ), and curb/gutter); 25 cy backfill of 57a stone with 95% compaction or greater; 3 ea plug existing sanitary sewer main with watertight clamp; 4 ea remove and dispose existing sanitary sewer lateral w/ disconnection of private lateral cleanout; 150 lf installation of 4" pvc (sdr26) sanitary sewer lateral up to 6' deep; installation of 6" pvc (sdr26) sanitary sewer lateral up to 6' deep.
AvailableWork include 40 LF cipp rehabilitation of 4" laterals; 800 LF cipp rehabilitation of 6" laterals; 20 LF cipp rehabilitation of 8" laterals; 16 EA 4" lateral t-liner installation up to the first 20'); 70 LF 4" lateral t-liner installation (beyond the first 20'); 329 EA 1480 LF 6" lateral t-liner installation (beyond the first 20'); 15,318 LF 8" cipp liner installation manhole to manhole (uv cured); 704 LF 10" cipp liner installation manhole to manhole (steam cure); 8,471 LF 10" cipp liner installation manhole to manhole (uv cured).
Posted Date
-
Due Date
Jan 8, 2026
Release: -
Close: Jan 8, 2026
Work include 40 LF cipp rehabilitation of 4" laterals; 800 LF cipp rehabilitation of 6" laterals; 20 LF cipp rehabilitation of 8" laterals; 16 EA 4" lateral t-liner installation up to the first 20'); 70 LF 4" lateral t-liner installation (beyond the first 20'); 329 EA 1480 LF 6" lateral t-liner installation (beyond the first 20'); 15,318 LF 8" cipp liner installation manhole to manhole (uv cured); 704 LF 10" cipp liner installation manhole to manhole (steam cure); 8,471 LF 10" cipp liner installation manhole to manhole (uv cured).
AvailableMore RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis