Discover Opportunities months before the RFP drops
Learn more →Water system imp.
Posted Date
Dec 10, 2025
Due Date
Jan 14, 2026
Release: Dec 10, 2025
Close: Jan 14, 2026
Water system imp.
AvailableWork includes installation of 12" water main and water treatment plant piping that also includes 1 EA connect to existing 8" PVC water plant line with tapping sleeve and valve; 160 LF 8" fill line to elevated tank and connect to flange; 250 LF 12" effluent line HDPE (SDR 11); 290 LF 12" backwash line (ductile iron); 3 EA 12" gate valve and box; 1 EA connect to existing 10" water main with tapping sleeve and valve; 1 EA fire hydrant; 540 LF erosion control. See outside link.
Posted Date
Aug 22, 2025
Due Date
Sep 24, 2025
Release: Aug 22, 2025
Close: Sep 24, 2025
Work includes installation of 12" water main and water treatment plant piping that also includes 1 EA connect to existing 8" PVC water plant line with tapping sleeve and valve; 160 LF 8" fill line to elevated tank and connect to flange; 250 LF 12" effluent line HDPE (SDR 11); 290 LF 12" backwash line (ductile iron); 3 EA 12" gate valve and box; 1 EA connect to existing 10" water main with tapping sleeve and valve; 1 EA fire hydrant; 540 LF erosion control. See outside link.
Work includes construction of 200,000 gallon elevated water storage tank construction.
Posted Date
Jan 11, 2025
Due Date
Feb 3, 2025
Release: Jan 11, 2025
Close: Feb 3, 2025
Work includes construction of 200,000 gallon elevated water storage tank construction.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis