Discover Opportunities months before the RFP drops
Learn more →Work includes the complete removal of the existing built-up roofing system down to the roof deck, including associated flashings, trim, and copings. A new 60 mil EPDM single-ply roofing system will be installed, incorporating recovery board, base ply, and polyisocyanurate insulation, covering approx. 30,000 SF. Work also includes replacing interior drain bodies, installing new roof drains with tapered sumps, replacing aluminum fascia with pre-manufactured fascia, and installing new parapet wall coping and stainless steel counter flashing.
Posted Date
Jun 6, 2025
Due Date
Jul 17, 2025
Release: Jun 6, 2025
Close: Jul 17, 2025
Work includes the complete removal of the existing built-up roofing system down to the roof deck, including associated flashings, trim, and copings. A new 60 mil EPDM single-ply roofing system will be installed, incorporating recovery board, base ply, and polyisocyanurate insulation, covering approx. 30,000 SF. Work also includes replacing interior drain bodies, installing new roof drains with tapered sumps, replacing aluminum fascia with pre-manufactured fascia, and installing new parapet wall coping and stainless steel counter flashing.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis