Discover Opportunities months before the RFP drops
Learn more →The Project includes the reconfiguration of existing gate counters on Concourse A. The new gate counters will accommodate both Ease and proprietary airline equipment requiring electrical and telecommunication modifications. The project will also include hold room modifications at the west end of the concourse, a new tenant space between A11 and A12, relocation of the FIDS at the south end of the Concourse A Phase 1 connector, and infrastructure for experiential elements including a projector light wall.
Posted Date
Dec 1, 2025
Due Date
Jan 8, 2026
Release: Dec 1, 2025
Close: Jan 8, 2026
The Project includes the reconfiguration of existing gate counters on Concourse A. The new gate counters will accommodate both Ease and proprietary airline equipment requiring electrical and telecommunication modifications. The project will also include hold room modifications at the west end of the concourse, a new tenant space between A11 and A12, relocation of the FIDS at the south end of the Concourse A Phase 1 connector, and infrastructure for experiential elements including a projector light wall.
AvailableWork includes 1 Ls of Comprehensive Grading, 425 CY of Select Granular Material, Class III, 5 CY of Borrow Excavation, 1 LS of Traffic Control, 1 LS of Erosion Control, 96 LF of Cured In Place Pipe Liner (CIPP), 30" , 2 EaMasonry Drainage Structures, 60 LF of 8" DI Sewer Pipe, PC 35080 LF of Chain Link Fence (10ft height).
Posted Date
Sep 15, 2025
Due Date
Oct 15, 2025
Release: Sep 15, 2025
Close: Oct 15, 2025
Work includes 1 Ls of Comprehensive Grading, 425 CY of Select Granular Material, Class III, 5 CY of Borrow Excavation, 1 LS of Traffic Control, 1 LS of Erosion Control, 96 LF of Cured In Place Pipe Liner (CIPP), 30" , 2 EaMasonry Drainage Structures, 60 LF of 8" DI Sewer Pipe, PC 35080 LF of Chain Link Fence (10ft height).
Charlotte Douglas International Airport seeks proposals for a commercial lease opportunity within a 4,479 square foot space in Concourse A. The RFP invites qualified companies to develop, design, build, and operate a commercial enterprise at the airport. Proposals must include a marketing plan, design plan, capital investment details, and an operations plan. The contract term is a minimum of five years, with flexibility based on the business plan and capital investment proposed.
Posted Date
Sep 23, 2024
Due Date
Nov 6, 2024
Release: Sep 23, 2024
Close: Nov 6, 2024
Charlotte Douglas International Airport seeks proposals for a commercial lease opportunity within a 4,479 square foot space in Concourse A. The RFP invites qualified companies to develop, design, build, and operate a commercial enterprise at the airport. Proposals must include a marketing plan, design plan, capital investment details, and an operations plan. The contract term is a minimum of five years, with flexibility based on the business plan and capital investment proposed.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis