Discover Opportunities months before the RFP drops
Learn more →Construction of 4,200 sf engineered metal welding shop building with a faculty office and two (2) toilet rooms, outdoor welding yard and covered/screened service yard & trash enclosure. Sitework to include revisions to existing parking area, security screen walls, garden screen walls, gates and a path to an entrances at the right of way. Electrical utility, water utility, sewer, and gas utility to service the shop building.
Posted Date
-
Due Date
Dec 8, 2025
Close: Dec 8, 2025
Construction of 4,200 sf engineered metal welding shop building with a faculty office and two (2) toilet rooms, outdoor welding yard and covered/screened service yard & trash enclosure. Sitework to include revisions to existing parking area, security screen walls, garden screen walls, gates and a path to an entrances at the right of way. Electrical utility, water utility, sewer, and gas utility to service the shop building.
Work includes construction of one 4,200 SF engineered metal welding building, exterior patios, site walls, and ev parking.
Posted Date
Oct 20, 2025
Due Date
Dec 17, 2025
Release: Oct 20, 2025
Close: Dec 17, 2025
Work includes construction of one 4,200 SF engineered metal welding building, exterior patios, site walls, and ev parking.
AvailableRelease: Oct 9, 2025
Close: Dec 9, 2025
For CAA flexible studio campus project.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis