Discover Opportunities months before the RFP drops
Learn more →Provide Building Commissioning Services for the CWC Jackson Center, a 20,350 (approximate) gross SF, purpose-built building.
Posted Date
May 6, 2025
Due Date
May 22, 2025
Release: May 6, 2025
Close: May 22, 2025
Provide Building Commissioning Services for the CWC Jackson Center, a 20,350 (approximate) gross SF, purpose-built building.
One (1) AGRAS -T50 agricultural UAV, and the necessary accessories to deliver quality agricultural education services.
Posted Date
Mar 8, 2025
Due Date
Mar 24, 2025
Release: Mar 8, 2025
Close: Mar 24, 2025
One (1) AGRAS -T50 agricultural UAV, and the necessary accessories to deliver quality agricultural education services.
The new center will be approx. 20,356 sq. FT and contains spaces for general education, faculty offices, and specialized spaces including a culinary arts kitchen, dedicated science laboratories, simulation nursing labs, and flexible lab space. Overall construction of the building includes concrete foundations, concrete flatwork, steel-framed structure, cold-formed metal wall framing, aluminum doors and windows, hollow metal frames with wood doors, painting, flooring, membrane roofing, cementitious and wood wall panels, division 10 items, mechanical, electrical, plumbing, delegated design fire sprinkler system, IT/Communication/Security infrastructure including cabling and certified terminations, access control.
Posted Date
Oct 22, 2024
Due Date
Nov 20, 2024
Release: Oct 22, 2024
Close: Nov 20, 2024
The new center will be approx. 20,356 sq. FT and contains spaces for general education, faculty offices, and specialized spaces including a culinary arts kitchen, dedicated science laboratories, simulation nursing labs, and flexible lab space. Overall construction of the building includes concrete foundations, concrete flatwork, steel-framed structure, cold-formed metal wall framing, aluminum doors and windows, hollow metal frames with wood doors, painting, flooring, membrane roofing, cementitious and wood wall panels, division 10 items, mechanical, electrical, plumbing, delegated design fire sprinkler system, IT/Communication/Security infrastructure including cabling and certified terminations, access control.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis