Discover Opportunities months before the RFP drops
Learn more →Well Pump installation, construction of electrical building and surge vault, buried piping installation, and site work at Wells 4 and 5. Construction of pipelines and associated appurtenances connecting Wells 4 and 5 to the existing Disinfection Building. Installation of fiber optic conduit and cable from the Disinfection Building to existing Well 3 and new Wells 4 and 5 electrical buildings. Replacement of chlorine piping in the existing disinfection building. Extension of an existing water distribution main.
Posted Date
Dec 10, 2024
Due Date
Jan 23, 2025
Release: Dec 10, 2024
Close: Jan 23, 2025
Well Pump installation, construction of electrical building and surge vault, buried piping installation, and site work at Wells 4 and 5. Construction of pipelines and associated appurtenances connecting Wells 4 and 5 to the existing Disinfection Building. Installation of fiber optic conduit and cable from the Disinfection Building to existing Well 3 and new Wells 4 and 5 electrical buildings. Replacement of chlorine piping in the existing disinfection building. Extension of an existing water distribution main.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis