Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Well Pump installation, construction of electrical building and surge vault, buried piping installation, and site work at Wells 4 and 5. Construction of pipelines and associated appurtenances connecting Wells 4 and 5 to the existing Disinfection Building. Installation of fiber optic conduit and cable from the Disinfection Building to existing Well 3 and new Wells 4 and 5 electrical buildings. Replacement of chlorine piping in the existing disinfection building. Extension of an existing water distribution main.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Base Bid - upgrades to the chemical feed system at Wells 2 and 4 at Sanatorium Road; SCADA system improvements and upgrades; installation of pressure transducers in wells 2&4; replacement of emergency generator and transfer switch; and other incidental items. Alternate Bid removal of emergency generator and transfer switch from water facility on Carol Court and relocation/installation at Sanatorium Road facility.
Posted Date
Nov 6, 2025
Due Date
Dec 19, 2025
Release: Nov 6, 2025
Close: Dec 19, 2025
Base Bid - upgrades to the chemical feed system at Wells 2 and 4 at Sanatorium Road; SCADA system improvements and upgrades; installation of pressure transducers in wells 2&4; replacement of emergency generator and transfer switch; and other incidental items. Alternate Bid removal of emergency generator and transfer switch from water facility on Carol Court and relocation/installation at Sanatorium Road facility.
AvailableThis RFP is for the construction and reconditioning of Groundwater Wells 4 & 5, including the construction of a chemical feed building, installation of new water mains, and reconditioning of existing wells.
Posted Date
-
Due Date
Dec 18, 2025
Close: Dec 18, 2025
This RFP is for the construction and reconditioning of Groundwater Wells 4 & 5, including the construction of a chemical feed building, installation of new water mains, and reconditioning of existing wells.
AvailableThe work includes construction of a chemical feed building, installation of new water mains, and reconditioning of the existing wells. Site work will involve traditional development and utility construction within both City right-of-way and property, as well as GDOT rights-of-way, including demolition, grading, drainage, and erosion control. All GDOT encroachments will be properly permitted. Water main extensions will be installed using horizontal directional drilling (HDD) and open-cut trenching methods. Work includes a 4-inch DIP HDD crossing (±114 LF) and abandonment of an existing 2-inch main (±103 LF) within GDOT right-of-way. Approximately 1,400 LF of new 8-inch main will be installed, and another 1,000 LF of 8-inch main will be added. Well head lines will range from 4- to 6-inch DIP and vary in lengths. The chemical feed building will contain separate sodium hypochlorite and fluoride rooms, a pipe gallery, and associated well houses. One 12-inch and one 8-inch well will be reconditioned, tested, and equipped with permanent pumps. All facilities will be enclosed within a secure perimeter fence.
Posted Date
-
Due Date
Dec 18, 2025
Release: -
Close:
The work includes construction of a chemical feed building, installation of new water mains, and reconditioning of the existing wells. Site work will involve traditional development and utility construction within both City right-of-way and property, as well as GDOT rights-of-way, including demolition, grading, drainage, and erosion control. All GDOT encroachments will be properly permitted. Water main extensions will be installed using horizontal directional drilling (HDD) and open-cut trenching methods. Work includes a 4-inch DIP HDD crossing (±114 LF) and abandonment of an existing 2-inch main (±103 LF) within GDOT right-of-way. Approximately 1,400 LF of new 8-inch main will be installed, and another 1,000 LF of 8-inch main will be added. Well head lines will range from 4- to 6-inch DIP and vary in lengths. The chemical feed building will contain separate sodium hypochlorite and fluoride rooms, a pipe gallery, and associated well houses. One 12-inch and one 8-inch well will be reconditioned, tested, and equipped with permanent pumps. All facilities will be enclosed within a secure perimeter fence.
Posted Date
-
Due Date
Dec 18, 2025
Release: -
Close:
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The work includes construction of a chemical feed building, installation of new water mains, and reconditioning of the existing wells. Site work will involve traditional development and utility construction within both City right-of-way and property, as well as GDOT rights-of-way, including demolition, grading, drainage, and erosion control. All GDOT encroachments will be properly permitted. Water main extensions will be installed using horizontal directional drilling (HDD) and open-cut trenching methods. Work includes a 4-inch DIP HDD crossing (±114 LF) and abandonment of an existing 2-inch main (±103 LF) within GDOT right-of-way. Approximately 1,400 LF of new 8-inch main will be installed, and another 1,000 LF of 8-inch main will be added. Well head lines will range from 4- to 6-inch DIP and vary in lengths. The chemical feed building will contain separate sodium hypochlorite and fluoride rooms, a pipe gallery, and associated well houses. One 12-inch and one 8-inch well will be reconditioned, tested, and equipped with permanent pumps. All facilities will be enclosed within a secure perimeter fence.
AvailableThe work includes construction of a chemical feed building, installation of new water mains, and reconditioning of the existing wells. Site work will involve traditional development and utility construction within both City right-of-way and property, as well as GDOT rights-of-way, including demolition, grading, drainage, and erosion control. All GDOT encroachments will be properly permitted. Water main extensions will be installed using horizontal directional drilling (HDD) and open-cut trenching methods. Work includes a 4-inch DIP HDD crossing (±114 LF) and abandonment of an existing 2-inch main (±103 LF) within GDOT right-of-way. Approximately 1,400 LF of new 8-inch main will be installed, and another 1,000 LF of 8-inch main will be added. Well head lines will range from 4- to 6-inch DIP and vary in lengths. The chemical feed building will contain separate sodium hypochlorite and fluoride rooms, a pipe gallery, and associated well houses. One 12-inch and one 8-inch well will be reconditioned, tested, and equipped with permanent pumps. All facilities will be enclosed within a secure perimeter fence.
Available