Discover Opportunities months before the RFP drops
Learn more →Central Iron County Water Conservancy District is soliciting bids for the Eagle Valley Well Drilling 2026 (SU1037) project in Cedar City, Utah. The work includes drilling a replacement culinary well with a 16-inch borehole to a minimum depth of 400 feet and abandoning the existing well. Bids are due by Wednesday, January 7, 2026 at 4:00 p.m. local time; bidding documents are available from Ensign Engineering & Land Surveying.
Posted Date
Dec 7, 2025
Due Date
Jan 7, 2026
Release: Dec 7, 2025
Close: Jan 7, 2026
Central Iron County Water Conservancy District is soliciting bids for the Eagle Valley Well Drilling 2026 (SU1037) project in Cedar City, Utah. The work includes drilling a replacement culinary well with a 16-inch borehole to a minimum depth of 400 feet and abandoning the existing well. Bids are due by Wednesday, January 7, 2026 at 4:00 p.m. local time; bidding documents are available from Ensign Engineering & Land Surveying.
AvailableCentral Iron County Water Conservancy District is soliciting bids for the Eagle Valley Well Drilling 2026 (SU1037) project in Cedar City, Utah. The work includes drilling a replacement culinary well with a 16-inch borehole to a minimum depth of 400 feet and abandoning the existing well. Bids are due by Wednesday, January 7, 2026 at 4:00 p.m. local time; bidding documents are available from Ensign Engineering & Land Surveying.
Posted Date
Dec 7, 2025
Due Date
Jan 7, 2026
Release: Dec 7, 2025
Close: Jan 7, 2026
Central Iron County Water Conservancy District is soliciting bids for the Eagle Valley Well Drilling 2026 (SU1037) project in Cedar City, Utah. The work includes drilling a replacement culinary well with a 16-inch borehole to a minimum depth of 400 feet and abandoning the existing well. Bids are due by Wednesday, January 7, 2026 at 4:00 p.m. local time; bidding documents are available from Ensign Engineering & Land Surveying.
AvailableWork includes connection of temporary tank to existing system, removal of existing tank, construction of 250,000 GAL of bolted steel tank, water meters, fire hydrants, upgrades to existing well house.
Posted Date
Sep 15, 2024
Due Date
Oct 10, 2024
Release: Sep 15, 2024
Close: Oct 10, 2024
Work includes connection of temporary tank to existing system, removal of existing tank, construction of 250,000 GAL of bolted steel tank, water meters, fire hydrants, upgrades to existing well house.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis