Discover Opportunities months before the RFP drops
Learn more →Perform stream restoration activities including: Provide machine access to worksites; install temp stream isolation to perform work in the dry; excavate, remove, and grade channel banks and floodplains; install large wood; and place spoils and grade.
Posted Date
Nov 20, 2025
Due Date
Feb 3, 2026
Release: Nov 20, 2025
Close: Feb 3, 2026
Perform stream restoration activities including: Provide machine access to worksites; install temp stream isolation to perform work in the dry; excavate, remove, and grade channel banks and floodplains; install large wood; and place spoils and grade.
AvailableInstall owner-furnished native plant materials and mulch. All planting locations will be areas disturbed by river restoration and will be bare mineral soil. Medium to large boulders are present and will be encountered during planting activities.
Posted Date
May 23, 2025
Due Date
Jun 12, 2025
Release: May 23, 2025
Close: Jun 12, 2025
Install owner-furnished native plant materials and mulch. All planting locations will be areas disturbed by river restoration and will be bare mineral soil. Medium to large boulders are present and will be encountered during planting activities.
Perform stream restoration activities located off road, including actions to provide machine access to worksites, temp stream bypasses to allow work to take place in the dry, excavation, removal and grading of channel banks and floodplains, installation of large wood, sorting and placement of streambed mix in the restored channel and floodplain footprint, spoils placement and grading and other site tasks required for installation.
Posted Date
Oct 15, 2024
Due Date
Nov 15, 2024
Release: Oct 15, 2024
Close: Nov 15, 2024
Perform stream restoration activities located off road, including actions to provide machine access to worksites, temp stream bypasses to allow work to take place in the dry, excavation, removal and grading of channel banks and floodplains, installation of large wood, sorting and placement of streambed mix in the restored channel and floodplain footprint, spoils placement and grading and other site tasks required for installation.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis