Discover Opportunities months before the RFP drops
Learn more →Work includes replacing the existing HVAC system removal of the existing pneumatic temperature control system and installation of a new direct digital control system with web-based access to manage the facility's mechanical systems. The boiler plant was replaced in 2024 and will not need to be renovated; this includes the plant’s associated distribution pumps and air separator. All existing heating hot water and chilled water piping, air-cooled chiller, chilled water distribution pumps, and air separators will be replaced. New roof-mounted variable air volume air handling units mounted on structural platforms will replace existing unit ventilators and interior air handling units, while new variable air volume terminal boxes will provide space zone control. Existing ductwork, grilles, registers, diffusers, exhaust fans, and cabinet unit heaters will also be replaced. The existing server room will receive a new split-system cooling unit, and the kitchen will add a new Type II hood over the existing dishwasher. Work will include the mechanical generally described above, and the electrical, fire alarm, fire sprinkler, structural, roofing, and general construction to support the mechanical system replacement project.
Posted Date
Dec 10, 2025
Due Date
Jan 7, 2026
Release: Dec 10, 2025
Close: Jan 7, 2026
Work includes replacing the existing HVAC system removal of the existing pneumatic temperature control system and installation of a new direct digital control system with web-based access to manage the facility's mechanical systems. The boiler plant was replaced in 2024 and will not need to be renovated; this includes the plant’s associated distribution pumps and air separator. All existing heating hot water and chilled water piping, air-cooled chiller, chilled water distribution pumps, and air separators will be replaced. New roof-mounted variable air volume air handling units mounted on structural platforms will replace existing unit ventilators and interior air handling units, while new variable air volume terminal boxes will provide space zone control. Existing ductwork, grilles, registers, diffusers, exhaust fans, and cabinet unit heaters will also be replaced. The existing server room will receive a new split-system cooling unit, and the kitchen will add a new Type II hood over the existing dishwasher. Work will include the mechanical generally described above, and the electrical, fire alarm, fire sprinkler, structural, roofing, and general construction to support the mechanical system replacement project.
AvailableRelease: Dec 6, 2025
Close: Dec 10, 2025
Provide New Forklifts.
Parcel for sale.
Posted Date
Nov 25, 2025
Due Date
Dec 16, 2025
Release: Nov 25, 2025
Close: Dec 16, 2025
Parcel for sale.
AvailableMore RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis