Discover Opportunities months before the RFP drops
Learn more →Work includes disposal of historic fill-contaminated soils, including loading, transportation and disposal.
Posted Date
Nov 19, 2025
Due Date
Dec 19, 2025
Release: Nov 19, 2025
Close: Dec 19, 2025
Work includes disposal of historic fill-contaminated soils, including loading, transportation and disposal.
AvailableRemediation of soil associated with several contaminants of concern detected at elevated concentrations during Site Investigation and Remedial Investigation activities conducted on-site. Contaminants of concern generally consist of various volatile organic compounds (VOCs), Semi-volatile organic compounds (SVOCs), poly aromatic hydrocarbons (PAHs), and Metals. Remediation of contaminated soil (as well as other concrete features) shall be completed through excavation, disposal, capping, a deed notice and associated Remedial Action Permit (RAP) for soils.
Posted Date
Aug 25, 2025
Due Date
Oct 28, 2025
Release: Aug 25, 2025
Close: Oct 28, 2025
Remediation of soil associated with several contaminants of concern detected at elevated concentrations during Site Investigation and Remedial Investigation activities conducted on-site. Contaminants of concern generally consist of various volatile organic compounds (VOCs), Semi-volatile organic compounds (SVOCs), poly aromatic hydrocarbons (PAHs), and Metals. Remediation of contaminated soil (as well as other concrete features) shall be completed through excavation, disposal, capping, a deed notice and associated Remedial Action Permit (RAP) for soils.
Park Remediation. Including 80,000 Sf synthetic turf surface system; football field c-surface water runoff; 3,864 SF biorentention media sand and gravel; 3,968 tons soil disposal; 529,840 SF geotextile fabric-site wide; 21,567 tons 14A clean fill - Material/transportation to site; 8,736 tons 14B topsoil-material/transportation to site; 20,202 SY 14C clean fill and topsoil spreading/grading; 9,608 SF brick entryway; 24,617 SF of 2" thick bituminous concrete walkway; 16,308 SF concrete sidewalks; 1,500 SF dugout concrete slab; 2,633 LF of 4" HDPE perforated pipe with filter sock; 80 LF of 12' HDPE solid pipe; 800 LF of 36" HDEP solid pipe.
Posted Date
Aug 25, 2025
Due Date
Dec 17, 2025
Release: Aug 25, 2025
Close: Dec 17, 2025
Park Remediation. Including 80,000 Sf synthetic turf surface system; football field c-surface water runoff; 3,864 SF biorentention media sand and gravel; 3,968 tons soil disposal; 529,840 SF geotextile fabric-site wide; 21,567 tons 14A clean fill - Material/transportation to site; 8,736 tons 14B topsoil-material/transportation to site; 20,202 SY 14C clean fill and topsoil spreading/grading; 9,608 SF brick entryway; 24,617 SF of 2" thick bituminous concrete walkway; 16,308 SF concrete sidewalks; 1,500 SF dugout concrete slab; 2,633 LF of 4" HDPE perforated pipe with filter sock; 80 LF of 12' HDPE solid pipe; 800 LF of 36" HDEP solid pipe.
AvailableMore RFPs available with Premium →
Premium
Access the largest public sector contact database
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Get complete source documentation & analysis