Learn more →Permanent erosion control, site work; 344 LF fencing and gates; site piping, valves; 2 ea tanks (500,000 gallon).
Posted Date
Oct 6, 2025
Due Date
Dec 3, 2025
Release: Oct 6, 2025
Close: Dec 3, 2025
Permanent erosion control, site work; 344 LF fencing and gates; site piping, valves; 2 ea tanks (500,000 gallon).
Add a new secondary clarifier with new effluent pump, new metering and flow splitting structures, replacement Return Activated Sludge and Waste Activated Sludge (RAS/WAS) pump station, two additional aerobic digesters with submersible self-aspirating aerators, new electrical and control building with new motor control center and master control panel, upgraded PG&E power service, new generator, and associated improvements to yard piping, grading, paving, power and control conduit and wiring, instrumentation, and PLC/SCADA controls. The work involves upgrading an existing wastewater treatment process and complete replacement of the electrical and control system for that facility.
Posted Date
Oct 17, 2025
Due Date
Dec 16, 2025
Release: Oct 17, 2025
Close: Dec 16, 2025
Add a new secondary clarifier with new effluent pump, new metering and flow splitting structures, replacement Return Activated Sludge and Waste Activated Sludge (RAS/WAS) pump station, two additional aerobic digesters with submersible self-aspirating aerators, new electrical and control building with new motor control center and master control panel, upgraded PG&E power service, new generator, and associated improvements to yard piping, grading, paving, power and control conduit and wiring, instrumentation, and PLC/SCADA controls. The work involves upgrading an existing wastewater treatment process and complete replacement of the electrical and control system for that facility.
AvailableFurnish the equipment (generators, automatic transfer switches) and material (fencing, pre-fabricated concrete pads) necessary to complete its critical facility generator implementation project (project). Ccwd crews will install the equipment and materials. Prospective bidders shall provide sealed bids to ccwd for the following: six (6) 40kw stationary diesel-powered generators; one (1) 80kw stationary diesel-powered generator; one (1) 15kw stationary diesel-powered generator; two (2) 20kw stationary diesel-powered generators; ten (10) applicable and compatible automatic transfer switches.
Posted Date
-
Due Date
Dec 19, 2025
Close: Dec 19, 2025
Furnish the equipment (generators, automatic transfer switches) and material (fencing, pre-fabricated concrete pads) necessary to complete its critical facility generator implementation project (project). Ccwd crews will install the equipment and materials. Prospective bidders shall provide sealed bids to ccwd for the following: six (6) 40kw stationary diesel-powered generators; one (1) 80kw stationary diesel-powered generator; one (1) 15kw stationary diesel-powered generator; two (2) 20kw stationary diesel-powered generators; ten (10) applicable and compatible automatic transfer switches.
AvailableMore RFPs available with Premium →
Premium
Access the largest public sector contact database
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Get complete source documentation & analysis